Free MB-330 Exam Braindumps (page: 12)

Page 11 of 83

DRAG DROP (Drag and Drop is not supported)
A manufacturing company is setting up a new warehouse.

The warehouse must store a product that is currently stored in another warehouse. You need to create new item coverage for the warehouse.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Select and Place:

  1. See Explanation section for answer.

Answer(s): A

Explanation:



A company operates a chain of retail coffee shops and a distribution center. Each coffee shop and the distribution center are distinct warehouses.

Cups and lids are replenished from a single distribution center. You need to configure store replenishment for coffee cup lids.
Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

  1. Set the coverage plan by dimension for warehouse on the Storage dimension group.
  2. Set the minimum item coverage to the safety stock quantity. Set the maximum to the maximum quantity of stock to reorder above the safety stock quantity.
  3. Set the minimum item coverage to the safety stock quantity. Set the maximum item coverage to 0.
  4. Create a coverage group assignment for the item.
  5. Set the minimum item coverage to 0. Set the maximum item coverage to the number of lids to keep on hand.

Answer(s): A,B,D



HOTSPOT (Drag and Drop is not supported)
A company uses Dynamics 365 Supply Chain Management to sell consumer electronics to retailers across North America.

An inventory manager needs to view purchase orders by different periods of time for all warehouses.

If there are insufficient orders for expected demand, the manager must create new purchase or transfer orders to meet the demand versus the current on-hand inventory that is already allocated for future demand.

The company also needs to keep a surplus of 5 percent of inventory for unexpected demand. You need to identify a solution to meet these requirements.
Which feature should you use for each requirement? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.
Hot Area:

  1. See Explanation section for answer.

Answer(s): A

Explanation:


Reference:

https://community.dynamics.com/ax/f/microsoft-dynamics-ax-forum/147370/supply-schedule-form/497235



A company uses planning optimization in Dynamics 365 Supply Chain Management. Automatic firming is enabled.

Some of the planned purchase orders are not being firmed as expected. The inventory planners therefore need to manually process planned purchase orders.

You need to include the planned purchase orders in automatic firming.
What are two possible configurations you can use? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

  1. Lead Time
  2. Automatic firming time fence (days)
  3. Requirements Date
  4. Freeze time fence on master plan

Answer(s): A,B


Reference:

https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/planning-optimization-auto-firming






Post your Comments and Discuss Microsoft MB-330 exam with other Community members: