HOTSPOT

A company makes engine parts used in the automotive industry.

The company is in the process of retooling an existing manufacturing plant. They plan to use Dynamics 365 Supply Chain Management to help support the Bill of Materials (BOM) product lifecycle engineering version control.

You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.

What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

Note: Each correct selection is worth one point.

Hot Area:

  1. See Explanation section for answer.

Answer(s): A

Explanation:

Box 1: production
Create runs for existing orders that need be scheduled for production.

Production BOM The actual BOM that is used for a specific production. A production BOM must take into account the actual resources that are used to produce the product.
When a production order, batch order, or kanban is created, the multiple levels of BOMs that are represented by phantoms are collapsed into one level and distributed over the operations for the order.

Box 2: Draft
Create visibility into cost and material estimates for prototype products.

Sketching/Draft BOM Gives a draft estimation of required materials in an early design phase and helps you do a rough estimate of cost and estimated product attributes. This BOM isn't usually used in enterprise resource planning (ERP).

Box 3: costing
Create visibility into cost estimates for products that use a very constrained component for the next three months.

Costing BOM Used to calculate the estimated cost of a product. For example, you can use a costing BOM when standard cost is used or the estimated planned cost of a given product is calculated. Costing BOMs can refer to a specific mix of materials and resources that are expected to be used. Therefore, you can use the costing BOM to create a representative estimated cost for a period and help avoid variances over time.

Incorrect:
* engineering
For an engineering product, changes to the lifecycle state are connected to the product's engineering versions. Therefore, the product's lifecycle state can also be connected to its engineering versions.
When the product lifecycle state is connected to an engineering version, you can use the lifecycle state to control which transactions are allowed for the engineering version.

Engineering BOM Typically used when you design products that are based on existing product portfolios. Engineering BOMs are structured to simplify the design process and group complex products into engineering modules. For simple products, it might be possible to engineering BOMs for the actual production process. However, for other products, the engineering BOM must be converted to an actual production BOM. Engineering BOMS are typically represented by phantoms in the BOM hierarchy. Although engineering BOMs can be used for the planning and execution of manufacturing operations, this approach can lead to inefficiencies, especially in repetitive operations where many orders are created.


Reference:

https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/bill-of-material-bom



A company uses engineering change management in Dynamics 365 Supply Chain Management. The Product readiness checks feature is turned off.

An existing engineering product must be reconfigured for a new product readiness policy.

You need to change the product readiness policy.

Where should you make this change?

  1. default order settings
  2. shared product
  3. engineering category
  4. product configuration model
  5. released product

Answer(s): C

Explanation:

Create and manage product readiness policies
Use product readiness policies to manage the readiness checks that apply to a product. Each readiness policy contains a set of readiness checks.
When a readiness policy is assigned to an engineering product category or a shared product, all the products that are related to that category or shared product will have the readiness checks that are included in the readiness policy.
To work with product readiness policies, go to Engineering change management > Setup > Product readiness policies. Then follow one of these steps.
To create a new policy, select New on the Action Pane, and then set the fields as described in the following subsections.
To edit an existing policy, select it in the list pane, select Edit on the Action Pane, and then set the fields as described in the following subsections.
To delete an existing policy, select it in the list pane, select Edit on the Action Pane, and then, on the General FastTab, make sure that the Active option is set to No. Then select Delete on the Action Pane.


Reference:

https://learn.microsoft.com/en-us/dynamics365/supply-chain/engineering-change-management/product- readiness



You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.

Subproduction orders for the subcomponent must be created when estimating production orders. You need to configure the BOM line to generate subproduction orders.

Which BOM line type should you use?

  1. Vendor
  2. Item
  3. Phantom
  4. Pegged supply

Answer(s): D


Reference:

https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/bill-of- material-bom



HOTSPOT

You are developing a new car audio system kit.

The kit configuration has restrictions based on car model, speaker size, and other expression constraints.

You need to set up a new item for the car audio system.

How should you create the new product? To answer, select the appropriate option in the answer area.

Note: Each correct selection is worth one point.

Hot Area:

  1. See Explanation section for answer.

Answer(s): A

Explanation:



DRAG DROP

A company produces custom-made bicycles that offer many different configurations.

Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009.
Wheel W-0001 is only compatible with frame F-0001.

You create the following configuration groups: Frames, Wheels

You need to ensure that users can only select valid combinations of frames and wheels.

In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Select and Place:

  1. See Explanation section for answer.

Answer(s): A

Explanation:


Reference:

https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration



Viewing page 6 of 55
Viewing questions 26 - 30 out of 270 questions



Post your Comments and Discuss Microsoft MB-335 exam dumps with other Community members:

MB-335 Exam Discussions & Posts

AI Tutor