A customer requires encryption at rest on every node root volume. In this scenario, which two encryption solutions will fulfill this requirement? (Choose two.)

  1. NVE
  2. IPsec
  3. NAE
  4. NSE

Answer(s): A,C


Reference:

https://docs.netapp.com/us-en/ontap/encryption-at-rest/configure-netapp-volume- encryption-concept.html#aggregate-level-encryption



Your customer currently has a 4-node AFF A400 cluster that runs ONTAP 9.8, with two NS224 shelves that are connected to each HA pair. The customer needs to add additional capacity to the cluster.
Which two actions would enable the customer to accomplish this task? (Choose two.)

  1. Connect the new NS224 shelves to the existing NS224 shelves and adjust the shelf IDs.
  2. Connect the new NS224 shelves to the existing Cisco Nexus 3232C switches.
  3. Deploy a new AFF A400 to the cluster.
  4. Deploy new, dedicated, storage switches for the new NS224 shelves.

Answer(s): A,C


Reference:

https://docs.netapp.com/us-en/ontap-systems/ns224/hot-add-shelf.html#prepare-an-aff- a700-aff-a800-or-aff-a400-ha-pair-to-hot-add-a-second-shelf



You are installing an AFF A700 system with two disk shelves using ADPv2. After setting up the cluster, you realize that one drive shelf was powered off and that the drives have not been assigned to any of the nodes.
In this scenario, which two resources will help you find a solution? (Choose two.)

  1. Active IQ Config Advisor
  2. NetApp Documentation Center
  3. NetApp Knowledge Base
  4. Active IQ Digital Advisor

Answer(s): A,C


Reference:

https://docs.netapp.com/us-en/ontap-systems/fas9000/install-detailed- guide.html#option-1-cable-the-controllers-to-ds212c-or-ds224c-drive-shelves



You are preparing to physically install a new AFF A400 cluster into a customer's racks. All equipment has been delivered to the customer's site.
Which three tools do you need to complete this installation? (Choose three.)

  1. additional network cables
  2. Phillips #2 screwdriver
  3. laptop computer
  4. slide rail kit
  5. cable management tray

Answer(s): A,B,C


Reference:

https://docs.netapp.com/us-en/ontap-systems/a400/install-detailed-guide.html#step-1- prepare-for-installation



Page 3 of 16



Post your Comments and Discuss Network Appliance NS0-184 exam with other Community members:

Chandana commented on August 29, 2024
The questions are really helpful
INDIA
upvote

Burnerths commented on July 17, 2023
Helpfull questions.
Anonymous
upvote