Free NCP Exam Braindumps (page: 12)

Page 11 of 41

Which set of steps should be used to stop the cluster in Nutanix operations?

  1. 1. Shut down Nutanix CVMs and Guest VMs. 2. Log on to a running controller VM in the cluster with SSH. 3. Stop the Nutanix cluster.
  2. 1. Shut down Nutanix controller VMs. 2. Log on to a running controller VM in the cluster with SSH.
    3. Stop the Nutanix cluster.
  3. 1. Shut down all Guest VMs. 2. Log on to a running controller VM in the cluster with SSH. 3. Stop the Nutanix cluster.
  4. 1. Log on to a running Controller VM in the cluster with SSH. 2. Shut down all other Controller VMs. 3.Stop the Nutanix clusters.

Answer(s): C



An administrator wants to view the IOPs statistics for each host simultaneously on the same graph. Which type of chart on the analysis page meets this requirement?

  1. Performance chart
  2. Entity Chart
  3. Measurement chart
  4. Metric chart

Answer(s): D



A VM user permanently deletes a directory on a guest VM. The Nutanix administrator has enabled Self-Services for this VM.
Which three steps must the administrator perform to restore the directory? (Choose Three)

  1. Create a clone of the VM from a previous snapshot and replace the original VM
  2. Connect to the cloned VM and copy the directory to the source VM
  3. Copy the directory from the snapshot disk to the original VM disk
  4. Launch the Nutanix SSR utility on the VM
  5. Select and mount the snapshot that contains the deleted directory

Answer(s): C,D,E



An administrator is working with sensitive data and wants to encrypt that data by Nutanix Software Encryption.
Which three types of information and components are required to enable this configuration? (Choose three)

  1. Key Management Server (KMS)
  2. Root Certificate Authority (CA)
  3. Signed Certificate for each CVM
  4. KMS Certificate
  5. Self-Encryption Drives (SED)

Answer(s): A,B,E






Post your Comments and Discuss Nutanix NCP exam with other Community members:

NCP Discussions & Posts