Free NCSE-Core Exam Braindumps (page: 13)

Page 12 of 49

A prospective customer wants to build a private cloud in addition to provisioning workloads across multiple public cloud providers.

Presently, the staff lacks the time and skillset for on-premises infrastructure management.

Which two features should qualify this project as a Nutanix opportunity? (choose two)

  1. Flow
  2. Calms
  3. Cloud Connect
  4. All falsh nodes
  5. Prism 1-Click operations

Answer(s): B,E



During a sales motion with a new prospect, the prospect asks to do a POC so they can experience Nutanix in their environment.

What is the most important item the SE must have in place with the prospect before moving forward with a POC?

  1. Start date of the POC
  2. Defined and measurable success criteria
  3. Meeting frequency
  4. Number of Nodes/Block to be used during the POC

Answer(s): B



Which two items are considered by Sizer when calculating the required cluster resources with only the Raw input workload type for a multi-VM workload? (Choose two)

  1. The vCPU:pCore ratio applied for specific VMs
  2. Large VM NUMA requirements
  3. The required RAM for the CVM
  4. The vCPU:pCore ratio applied to all VMs

Answer(s): C,D



Refer to the exhibit.

***Exhibit is Missing***

Based on the sizing scenario, what level of resiliency can be inferred about the configuration?

  1. FTT1
  2. N+0
  3. N+1
  4. N+2

Answer(s): D






Post your Comments and Discuss Nutanix NCSE-Core exam with other Community members:

NCSE-Core Discussions & Posts