An administrator has a custom backup application that requires a 2TB disk and runs in Windows. Throughput is considerably lower than expected.
The application was installed on a VM with the following configuration:

•Four vCPUs with one core/vCPU
•4GB of Memory
•One 50GB vDisk for the Windows installation
•One 2TB vDisk for the application

What is the recommended configuration change to improve throughput?

  1. Increase the number of cores per vCPU
  2. Increase the vCPUs assigned to the VM
  3. Span the 2TB disk across four vDisks
  4. Add 4GB of memory to the VM

Answer(s): C



A customer recently set up Async Replication between Site A and Site B. The customer wants to conduct a planned failover and clicks Activate on Site B.
The customer then runs the following command on Site A:
ncli pd deactivate_and destroy_vms name=<protection_domain_name>

What does this do to the customer environment?

  1. VMs get deleted from Site B. and the protection domain is now Active.
  2. VMs are powered off on Site A and must be manually powered on at Site
  3. VMs get deleted from Site A and the protection domain is no longer active.
  4. Customer must then manually power off VMs at Site A and power them on at Site B.

Answer(s): C


Reference:

https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v5_10:wc- protection-domain-failback-disaster.html



An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.
How should the administrator perform this task?

  1. Check the Disregard Existing Workloads radio button in the Runway scenario.
  2. Check the Disregard Existing Nodes radio button in the Runway scenario.
  3. Add up the recovered workloads and manually remove from the Runway configuration.
  4. Power down the workloads during a maintenance window and run the Capacity Runway.

Answer(s): A



A customer has a primary datacenter with 12 Nutanix blocks distributed across three racks. The customer wants to achieve the most resiliency possible. They also have a datacenter in a branch office that is 400 kilometers away from the primary datacenter.
Which two solutions should be used? (Choose two.)

  1. Time Stream to a remote site
  2. Async DR to a remote site
  3. Rack awareness
  4. Block awareness

Answer(s): B,C