OMG UM0-401 Exam
UM0-401 OCRES-Intermediate Exam (Page 13 )

Updated On: 19-Jan-2026

What is the name of the Active Resource that is responsible for executing actions in the system?

  1. Agent
  2. Thread
  3. Engine
  4. Concurrent Unit

Answer(s): D



What is the maximum absolute time difference in relative frequencies of the clock and its reference clock between two successive time ticks?

  1. drift
  2. offset
  3. maximal value
  4. maximum stability

Answer(s): A



What is the schedulable resource that an action executes on?

  1. Host
  2. Scheduler
  3. SResource
  4. Scheduling job

Answer(s): A



Dynamic scheduling includes utility based or-------------- scheduling.

  1. value based
  2. variable based
  3. economic based
  4. continuous based

Answer(s): A



In the Dynamic Usage Model, the usage of resources is represented by a scenario instance.
What is an ordered series of steps called?

  1. Action
  2. Action Item
  3. Action Instance
  4. Action Execution

Answer(s): D



Viewing page 13 of 37
Viewing questions 61 - 65 out of 180 questions



Post your Comments and Discuss OMG UM0-401 exam prep with other Community members:

Join the UM0-401 Discussion