Free PEGACRSA80V1 Exam Braindumps (page: 5)

Page 4 of 15

Pega Robotic Coding Standards require proper naming conventions and organization of project components. You have added the _CRM_GC project item to the
CRMPrj. Which three components belong in the _CRM_GC project item? (Choose three.)

  1. dataTimeUtils
  2. messageDialog
  3. stringUtils
  4. interactionManager
  5. actGetStatus

Answer(s): A,B,C



You are automating the login process for a web application. There are three possible scenarios that may occur: (1) You may successfully login, (2) you may not be successfully logging in, or (3) you may log in but go to the change password screen.

Which control from the Toolbox do you use to determine which page you were on after performing the login function?

  1. Signal
  2. Switch
  3. WaitAny
  4. WaitAll

Answer(s): C



Robotic Automation Studio has several methods to manage the flow of an automation depending on when a control is matched. In the Answer Area, drag the description on the left to its matching Design Block.

Select and Place:

Exhibit A:



Exhibit B:

  1. Please refer to Exhibit B for the answer.

Answer(s): A



A user access an HTML table with an undefined number of rows and then searches the table to find the row needed to complete the process. You must automate the search and return the result to the user. Which two coding options are available to create the automation? (Choose two.)

  1. TableView component
  2. LookupTable component
  3. ForLoop component
  4. Query on a dataCell

Answer(s): C,D






Post your Comments and Discuss Pegasystems PEGACRSA80V1 exam with other Community members:

PEGACRSA80V1 Discussions & Posts