Free Pure Storage FlashArray-Implementation-Specialist Exam Braindumps (page: 2)

An Implementation Engineer is performing a capacity consolidation on an X50R3.
Which command is needed for the engineer to determine whether the customer's FlashArray supports SAS Flash Modules?

  1. puredrive list --total --type controller
  2. purehw list --type controller --all
  3. purehw list --type drive --all

Answer(s): C

Explanation:

This command reports every installed drive module, identifying SAS Flash Modules if present, whereas the other commands do not enumerate individual drive types.



On a FlashArray//XR50R2/3 Fibre Channel (FC) array, what is the default type and placement of the PCIe FC card?

  1. 2-port in slot 0
  2. 2-port in slot 2
  3. 4-port in slot 0

Answer(s): B

Explanation:

On an X50R2/3 FC array, Pure ships each controller with a factory-installed dual-port 32 Gb Fibre Channel card in the PCIe slot numbered 2, providing out-of-the-box SAN connectivity.



A data pack has been installed and the puredrive list command shows the drives in "unadmitted" status.
Which command should be used to complete the admission?

  1. puredrive add
  2. puredrive admit
  3. purearray drive admit

Answer(s): B

Explanation:

The puredrive admit command is used to complete the admission process for drives showing as "unadmitted," integrating them fully into the FlashArray.



What is the redundancy of the FlashArray//XL PSUs?

  1. 1+1
  2. 2+2
  3. 3+1

Answer(s): B

Explanation:

FlashArray//XL power supply units (PSUs) are designed with 2+2 redundancy, meaning there are four PSUs where any two can fail without impacting array operation.



Which PCIe slot supports 4-port FC cards on FlashArray//XL?

  1. 2
  2. 5
  3. 8

Answer(s): C

Explanation:

On FlashArray//XL, the PCIe slot 8 supports installation of 4-port Fibre Channel cards, allowing higher port density for SAN connectivity.



A FlashArray//XR2/3 has an Ethernet mezzanine (EMEZZ), what are the interface names of the ports on the mezzanine?

  1. ETH6, ETH7, ETH8, and ETH9
  2. ETH8, ETH9, ETH10, and ETH11
  3. ETH10, ETH11, ETH12, and ETH13

Answer(s): B

Explanation:

The Ethernet mezzanine on FlashArray//XR2/3 is assigned interfaces starting at ETH8 through ETH11, reflecting the numbering scheme for additional Ethernet ports beyond the base interfaces.



What should an Implementation Engineer do when installing rails in a threaded-hole rack?

  1. Use the positioning studs
  2. Install the rails as is
  3. Make an adjustment to the rack

Answer(s): A

Explanation:

Positioning studs are used to align and secure the rails correctly in a threaded-hole rack, ensuring proper installation and stability of the FlashArray.



Support requests a powercycle on a newly-installed FlashArray.
What is the correct way to perform this action?

  1. Push the power button on each controller.
  2. Unplug the cable on each power supply.
  3. Run purearray reboot.

Answer(s): C

Explanation:

The proper and safe method to power cycle a FlashArray is to run the purearray reboot command, which gracefully restarts the system without risking data integrity or hardware issues.






Post your Comments and Discuss Pure Storage FlashArray-Implementation-Specialist exam prep with other Community members:

FlashArray-Implementation-Specialist Exam Discussions & Posts