Free CSQA Exam Braindumps
Certified Software Quality Analyst (CSQA) Questions 366–370 (page: 75)

Updated On: 10-Feb-2026

An operator verifies that all production jobs are run. This is

  1. Quality control
  2. Quality assurance
  3. Production planning
  4. Disaster recovery

Answer(s): A



The testing intended to show that previously correct software has not been adversely affected by changes is called:

  1. Black-box testing
  2. White box testing
  3. Regression testing

Answer(s): C



The best phase that testing should begin is

  1. After project starts
  2. After requirements phase
  3. After design phase
  4. After coding

Answer(s): B



Assume you are a new quality assurance manager. You have observed a high failure rate in production due to defects in the computer programs. If you follow good quality practices, the approach you would take to reduce the incidence of failure is to:

  1. Initiate code inspections to identify defects in code
  2. Increase the type and extent of testing to remove defects before production
  3. Classify and count the defects so that you can identify the defect of highest frequency and eliminate the root cause of the defect
  4. Encourage the programmers to try harder to make fewer defects
  5. Include individual defect rates in the performance appraisal system

Answer(s): C



The standards that have the greatest acceptance, and the highest compliance percentage, are normally those standards developed by

  1. Senior management
  2. The standards committee
  3. A quality assurance group
  4. The users of the standards
  5. Internal auditors

Answer(s): A



Viewing page 75 of 162
Viewing questions 371 - 375 out of 804 questions


Post your Comments and Discuss Quality Assurance CSQA exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!