Free SAP C_THR82_2311 Exam Questions (page: 7)

Which of the following are unique Edit Form Attributes options in 360 Reviews?
Note: There are 3 correct answers to this question.

  1. Enable Development Plan Integration
  2. Calculation on form
  3. Lock down section weights
  4. Recall enabled
  5. Anonymous 360

Answer(s): A,B,D



Which of the following options in 360 Reviews can be controlled from Form Template Settings?
Note: There are 2 correct answers to this question.

  1. Enable Participant names on 360.
  2. Enable enhanced Detailed 360 Report anonymity.
  3. Enable anonymity in the 360 reporting functions.
  4. Enable 360 Drilldown Permission.

Answer(s): B,C



In the Summary section with manual rating enabled, which of the following is considered a best practice to ensure a performance form will have a rating of record?
Note: There are 2 correct answers to this question.

  1. Define Manual Overall Rating as a required field for the role providing the final rating (like EM).
  2. Enable Allow Override Unrated and define Manual Overall Rating as a required field for all steps.
  3. Enable Enforce Maximum Overall Score (EMOS) to define a rule to enforce that an overall score is populated in the form.
  4. Define the Section Comments field as a required field for the role providing the final rating (like EM).

Answer(s): A,B



Your customer wants to ensure that all review forms are sent to the second step of their route map on a specified date. What settings do you need to make to ensure this takes place?

  1. Define the start date for the first step in the route map configuration in Manage Route Maps, Select the "Enforce Start Date" option in Step 2 of the route map.
  2. Define the due date for the first step in the route map configuration in Form Template Settings, Select the "Automatic send on due date" option in Step 1 of the route map.
  3. Define the due date for the first step in the route map configuration in Manage Route Maps, Select the "Automatic send on due date" option in Step 1 of the route map and also select the "Always send regardless of validation" option.
  4. Define the exit date for the first step in the route map configuration in Manage Route Maps, Select the "Automatic send on due date" option in Step 1 of the route map and also select the "Always send regardless of validation" option.

Answer(s): C