Free SAP C_TS4CO_1909 Exam Braindumps (page: 2)

97.5% Passing Rate DOWNLOAD PDF EXAM
180 Questions & Answers
Page 2 of 46

Which of the following values can be calculated using results analysis? 3 answers

  1. Work in progress
  2. Reserves for unrealized costs
  3. Cost of sales
  4. Cost of goods manufactured
  5. Gross margin

Answer(s): A,B,C



Which activities can you perform while you create cost center hierarchies? There are 2 correct answers to this question

  1. Reassign a cost center to another node of the standard hierarchy.
  2. Assign a standard hierarchy to several controlling areas.
  3. Create a cost center without specifying a standard hierarchy
  4. Append nodes and cost centers to a node of the standard hierarchy.

Answer(s): A,D



You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANAstandard configuration. What requirement must be fulfilled ? 2 Answers

  1. The type of the corresponding general ledger must be primary cost/revenue or secondary cost
  2. Costing-based Profitability Analysis must be active
  3. Account-based profitability mustbe active.
  4. The type of the corresponding general ledger must be balance sheet

Answer(s): A,D



When you create a profit center, what company code(s) is it assigned to by default ?

  1. All company codes where profit center is activated
  2. Allcompany codes, irrespective of controlling area
  3. All company codes within the operating concern
  4. All company codes within the controlling area

Answer(s): D






Post your Comments and Discuss SAP C_TS4CO_1909 exam prep with other Community members:

C_TS4CO_1909 Exam Discussions & Posts