When deploying a copy on write backup solution that uses 3rd party copy, which two statements are true? (Choose two.)

  1. No backup servers are required.
  2. The NDMP engine must be loaded on the backup server
  3. A backup server will still control the environment such as loading tapes.
  4. The backup server must be able to see the 3rd party copy engine as well as the LUN to be backed up.

Answer(s): C,D



You have been tasked with designing an iSCSI based storage network that support 24 servers at a primary location attached to a 2TB storage array including a tape library with four tape drives. In addition, there are 18 branch offices each with at least one Windows server that needs to gain access to primary storage, tape, and file sharing. Which two should be considered as part of this design? (Choose two.)

  1. Determine if current switches support 802.11g and jumbo frames.
  2. Upgrade the remote network to 1Gb to every device and install iSCSI hardware adapters.
  3. Assess network topology (bandwidth, available ports, current workload) and file server utilization and the connectivity needs of storage and tape.
  4. Look at available network bandwidth at primary location and to remote facilities and ability of current infrastructure to support more devices and bandwidth.

Answer(s): C,D



You have been tasked with identifying upgrade options for your networked storage. Which two should you do? (Choose two.)

  1. Only select hardware and software that is SMI-S compliant.
  2. Share all received information openly with all vendors involved.
  3. Understand needs and requirements as well capabilities of your existing technology.
  4. Enlist legal advice or support of your purchasing department when creating RFI, RFP, and RFQs.

Answer(s): C,D



What is the primary objective of the storage capacity planning process?

  1. To demonstrate the effects of changes in storage service levels.
  2. To reach agreement with application representatives and management over the storage requirements.
  3. To produce a capacity plan at agreed intervals which fits into the business planning cycle, e.g. the financial year.
  4. To calculate the effects on ILM service levels, array and fabric utilization of the estimated demand over the period of the planning horizon.

Answer(s): C



You notice, from continually monitoring a SAN array, that an array has a number of soft SCSI bus errors. You trace the errors back to a single drive using a vendor's event tool.
Which two would correct this? (Choose two.)

  1. You should pull the drive out immediately and replace it to prevent data corruption on the RAID set.
  2. Soft SCSI bus errors can be safely ignored as they do not actually denote any service requirements.
  3. You should research the error to determine the impact and proper response including the vendor in these discussions.
  4. Review the logs from the array to identify if there is a pattern of large numbers of these SCSI errors. A large number of these SCSI bus errors may denote a predictive failure.

Answer(s): C,D