Free TB0-121 Exam Braindumps (page: 7)

Page 6 of 31

Click the Exhibit button.


In the Organization Model shown in the graphic, the Operations Account Opening Team must be able to reallocate work to other resources. Privilege opReallocateWorkPrivilege has been created. The System task "Work Item Allocation" exists at both Organization Unit and Organization Model levels.
What must be done to make it possible for the team to reallocate work to other resources? (Choose two.)

  1. The privilege must be assigned to the Organization Unit.
  2. The privilege must be associated with the System task for this Organization Unit,
  3. The privilege must be associated with the System task for the Organization Model.
  4. The privilege must be assigned to the Organization Model.

Answer(s): A,B



Which three requirements must be met in order to enable the Runtime clients to be opened from TIBCO Business Studio? (Choose three.)

  1. A deployment server must be created and configured.
  2. The login URL for the Administrator interface must be configured.
  3. The login URL for the Workspace interface must be configured.
  4. The login URL for the Open space interface must be configured.
  5. The URL for the WebDAV server must be configured.
  6. The URL of the clients must be the same as the administrator.

Answer(s): A,B,F



Which requirement must be met in order to create a deployment server?

  1. A Custom User task related to use forms must be created before deployment.
  2. You must ensure that no validation errors related to the project are displayed.
  3. The Solution Design capability must be turned on.
  4. Any scripts in a process must be implemented as JavaScript.

Answer(s): C



Click the Exhibit button.


At some point in a process, one Catch Timer Intermediate Event, two Catch Message Intermediate Events, and one Catch Signal Intermediate Event are generated in parallel. Whichever event is satisfied first should be processed and the other three should be withdrawn.

Which pattern can satisfy this requirement?

  1. Place all four events after an Exclusive Decision / Merge (XOR) Event Based Gateway, with no signal throwing needed
  2. Link the output from all four events into a Script task, which contains a jumpto command to withdraw the remaining events
  3. Place a Catch Signal Event on the boundary of all four events, whichever completes first throws a signal to the others
  4. Link the output from all four events into a Complex Decision / Merge Gateway, configured to proceed when the first input arrives

Answer(s): A






Post your Comments and Discuss Tibco TB0-121 exam with other Community members:

TB0-121 Discussions & Posts