Free TB0-121 Exam Braindumps (page: 8)

Page 7 of 31

Which two statements are true about Process Views? (Choose two.)

  1. They can contain process instances from one or more processes.
  2. There is a limit to the number of Process Views that can be created.
  3. They can be filtered and/or sorted in different ways.
  4. The user cannot specify which specific Process View to display by default on login

Answer(s): A,C



To debug business processes, breakpoints are set that suspend the process flow execution. What are the two valid breakpoints? (Choose two.)

  1. Add after
  2. Add before
  3. Add together
  4. Add one
  5. Add both

Answer(s): C,D



What is the default Correlation mode for the Start Message task?

  1. Correlate
  2. Initialize
  3. Join
  4. Visible

Answer(s): B



A business process has been developed and needs to be analyzed with Simulation. Which three statements are true? (Choose three.)

  1. The process simulation can enter into an infinite loop even if there are no logical errors in looping structures in the business process.
  2. A Simulation Control Strategy must be provided for each simulation to specify the activity to proceed with, once the simulation ends.
  3. Simulations allow the business process to run without assigning participants before deploying the process.
  4. Simulations can be used to examine improvements between the target business process and an existing business process.
  5. Historical data can be used to specify the activity duration of a process configured for simulation.

Answer(s): A,D,E






Post your Comments and Discuss Tibco TB0-121 exam with other Community members:

TB0-121 Discussions & Posts