An owner has expressed concerns to the LEED AP about the costs associated with the integrative process. How can the LEED AP relieve the owner's concerns?

  1. The LEED AP should explain to the owner that since the integrative process is not a prerequisite, it can be dropped from the project thus cutting back project costs
  2. The LEED AP should explain that while the first costs and the design fees will be higher due to the integrative process, the operational savings will make up for the extra costs
  3. The LEED AP should explain that the integrative process can easily be postponed and reconsidered until after the design for the construction phase, when it will most likely save costs for the project
  4. The LEED AP should explain that the integrative process reduces costs by avoiding delays associated with design changes during the construction document phase and reducing change orders during construction

Answer(s): D

Explanation:

The integrative process is a strategy that can lead to both immediate and long-term cost savings. By engaging in early analysis of the interrelationships among systems, the project team can identify unique opportunities and challenges. This early engagement helps to optimize the design, which can reduce the time and cost associated with making design changes later in the project and minimize the need for change orders during construction.


Reference:

Understanding Integrative Design in LEEDv4 - BuildingGreen. LEED v4 for Interior Design and Construction (ID+C): Reference Guide. New LEED Integrative Process Credit Encourages Design-Build.



To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

  1. 10%
  2. 20%
  3. 30%
  4. 50%

Answer(s): C

Explanation:

To meet the Increased Ventilation strategy under the Enhanced Indoor Air Quality Strategies credit, the breathing zone outdoor air ventilation rates must be increased by at least 30% above the minimum rates required by ASHRAE 62.1-2010. This increase is intended to improve indoor air quality and promote a healthier indoor environment.


Reference:

The LEED v4 reference guide for Interior Design and Construction includes this requirement as part of the strategies to enhance indoor air quality.



Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

  1. Discovery; design and construction; occupancy; operations and feedback
  2. Discovery and design; construction and occupancy; post occupancy and operations
  3. Pre-design and design; construction and occupancy; post occupancy and operations
  4. Pre-design and design; construction and pre-occupancy; post occupancy and operations

Answer(s): A

Explanation:

The Integrative Process Credit under LEED AP Interior Design + Construction V4 emphasizes the importance of a holistic approach that includes various phases of a project. The correct phases that should be included to comply with the intent of this credit are Discovery, Design and Construction, Occupancy, Operations, and Feedback. This approach ensures that sustainable strategies are integrated from the earliest stages of the project and continue through to post-occupancy to maximize performance and sustainability.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction provides detailed guidance on the Integrative Process Credit, highlighting the need for a comprehensive approach that spans the entire project timeline.



A tenant implements the following strategies to reduce the amount of water used.
Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?

  1. Composting toilet
  2. Low-flow irrigation system
  3. Commercial clothes washer
  4. Roof runoff for chiller make-up water

Answer(s): A

Explanation:

The composting toilet is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors because it significantly reduces the amount of water used for conventional flushing toilets. By composting human waste, this system eliminates the need for water in the disposal process, contributing to indoor water use reduction.


Reference:

The LEED v4 Reference Guide for Interior Design and Construction includes the composting toilet as a strategy for reducing water use within the indoor environment. The LEED v4 Indoor Water Use Reduction Calculator also provides a framework for calculating water savings, where the use of composting toilets can contribute to achieving the prerequisite and credit requirements for water use reduction.