Free LEED-AP-O-M Exam Braindumps
LEED AP Operations + Maintenance Questions 66–70 (page: 15)

Updated On: 10-Feb-2026

Which of the following alternative transportation strategies help reduce pollution and land development effects from automobile use?

  1. Use of motorcycles
  2. Use of hybrid vehicles
  3. Compressed workweeks
  4. Use of Liquified Petroleum Gas (LPG) vehicles

Answer(s): C

Explanation:

Compressed workweeks can help reduce pollution and land development effects from automobile use. This strategy involves working longer hours on fewer days, which reduces the number of commuting trips and thus the associated pollution and land development impacts. It's one of the alternative transportation strategies recognized by the USGBC in the LEED AP O+M rating system1.


Reference:

LEED AP Operations + Maintenance (LEED AP O+M) V4.1 by usgbc.org2.



Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

  1. Implement an alternative transportation program and conduct a transportation survey
  2. Conduct a week long observation of the parking lot usage and estimate the alternative transportation ate
  3. Conduct a transportation survey and demonstrate that the alternative transportation rate has been met
  4. Implement an alternative transportation program and estimate the alternative transportation rate

Answer(s): A

Explanation:

The Location and Transportation Credit for Alternative Transportation under the LEED AP Operations + Maintenance (LEED AP O+M) V4.1 encourages projects to implement strategies that promote the use of alternative transportation. Among the options provided, implementing an alternative transportation program and conducting a transportation survey is the strategy that allows the project to achieve maximum points. This strategy not only promotes the use of alternative transportation but also provides data that can be used to evaluate the effectiveness of the program and make necessary adjustments.


Reference:

LEED v4: Building Operations + Maintenance Guide, LEED AP with specialty



A standard reference when creating an indoor air quality management program is

  1. Home Energy Rating System (HERS)
  2. American Society of Heating, Refrigerating and Air - Conditioning Engineers 90.1 - 2010 (ASHRAE)
  3. Chartered Institution of Building Services Engineers (CIBSE)
  4. Indoor Air Quality Building Education and Assessment Model (I-BEAM)

Answer(s): D

Explanation:

The Indoor Air Quality Building Education and Assessment Model (I-BEAM) is a comprehensive tool designed for use by building professionals and others interested in indoor air quality (IAQ) in commercial buildings. I-BEAM updates and expands EPA's Building Air Quality guidance and is designed to be comprehensive state-of-the-art guidance for managing IAQ in commercial buildings1. This guidance was designed to be used by in-house staff to conduct a building investigation to identify indoor air problems and to enhance indoor air quality1.


Reference:

LEED v4: Building Operations + Maintenance Guide



What information is required when adding a new space within a facility to the ENERGY STAR® Portfolio Manager?

  1. Space floor area and hours of operation
  2. Number of workers and lighting power density
  3. Name of utility company and 12 months of energy use data
  4. Statement of energy performance and carbon emissions data

Answer(s): A

Explanation:

When adding a new space within a facility to the ENERGY STAR® Portfolio Manager, the required information includes the space floor area and hours of operation1. The tool helps building owners and tenants measure and track energy, water use, and waste, all in a secure online environment1. It is important to note that to receive an ENERGY STAR score in Portfolio Manager, you must enter 12 full calendar months of energy data for all energy types, in addition to complete data on property use details such as hours of operation and workers2.


Reference:

LEED AP Operations + Maintenance (LEED AP O+M) V4.1 by usgbc.org3 How to Enter and Manage Tenant Spaces in ENERGY STAR® Portfolio Manager1 ENERGY STAR Score2



An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects.
What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?

  1. Requirements around the selection of low-emitting materials for renovation projects
  2. Requirements for contractors to safeguard air quality during renovation
  3. Requirements for the salvage and reuse of furniture within the building
  4. Requirements for contractors to perform construction activity pollution prevention

Answer(s): B

Explanation:

To meet the requirements of the Materials and Resources Prerequisite for Facility Maintenance and Renovation Policy, an organization must include provisions to protect indoor air quality during renovation activities. This includes implementing dust control measures, ensuring proper ventilation, and minimizing the release of pollutants. These requirements are essential for protecting the health and safety of building occupants during renovation projects.


Reference:

The Materials and Resources section of the LEED O+M Reference Guide discusses the components of a comprehensive Facility Maintenance and Renovation Policy, including the importance of safeguarding air quality during construction and renovation activities.



Viewing page 15 of 35
Viewing questions 71 - 75 out of 168 questions


Post your Comments and Discuss US Green Building Council LEED-AP-O-M exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!