Which of the following strategies meets energy demand with renewable energy?

  1. Installing a solar hot water heater
  2. Incinerating waste to heat a home
  3. Implementing a composting program in an office break room
  4. Purchasing Renewable Energy Certificates (RECs)from a clean coal plant

Answer(s): A



The project team is conducting a feasibility study of a building project. The developer has pre- qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?

  1. A brownfield site with no access to metro
  2. A brownfield site in a national park with car access only
  3. A greenfield site with access to public transport and proximity to grocery stores
  4. A brownfield site with access to five lines of public transportation and basic services

Answer(s): D



Which of the following strategies prioritizes cost-effectiveness when designing a LEED project?

  1. Onsite renewable systems
  2. Enhanced Commissioning (Cx)
  3. Measuring and verifying systems performance for one year
  4. Applying an integrative design process

Answer(s): B



Which of the following is a minimum program requirement for the LEED for New Construction and Major Renovations Rating System?

  1. Comply with minimum project size
  2. Include temporary structures in floor area calculations
  3. Define a site boundary for the sole purpose of complying with credits
  4. Comply with the best practices of the International Organization for Standardization (ISO)

Answer(s): A