Which of the following defines what materials have to be scheduled to make the end products?

  1. Bills of material
  2. Master production schedule
  3. Engineering change control bill
  4. All of the Above

Answer(s): A



Which of the following are the purposes of material requirement planning so items in the master production schedule are made on time?

  1. To determine the components needed
  2. To determine the quantities
  3. To determine the due dates
  4. All of the above

Answer(s): D



Exploding is the process of multiplying the requirements by:

  1. The usage quantity
  2. By recording the appropriate requirements throughout the product tress
  3. Both A, B
  4. None of the above

Answer(s): C



The process of placing the exploded requirements in their proper periods based on lead time is called

  1. Offsetting
  2. Exploding the equipments
  3. Production plan
  4. Where-used reports

Answer(s): A



If there are 20 as in stock, only 30 needs to be made, then the requirements for components parts would be:

  1. Reduced accordingly
  2. Increased accordingly
  3. Added accordingly
  4. Both B & C

Answer(s): A