The material requirement plan authorizes production activity control (PAC):
Answer(s): D
The flow of work centers must be planned to meet delivery dates which means production activity control must do the following:
Answer(s): C
Gather the information needed by the shop floor to make the product. Release orders to the shop floor as authorized by the material equipment plan. This is called dispatching. Production activity control will do such things in:
Answer(s): B
This is a true representation
Which one of the following is NOT done by PAC in control phase?