At the MRP planning level, the process of priority plans must be checked against available capacity is called

  1. Master Production schedule (MPS)
  2. Capacity Requirements planning (CRP)
  3. Production activity control (PAC)
  4. Manufacturing Planning and control function (MPC)

Answer(s): B



Which of the following details are true about time buckets EXCEPT:

  1. These are often a week
  2. Can be any length of time convenient to the company
  3. Companies can move to daily time buckets
  4. Needs to avoid future problems

Answer(s): D



The process of colleting the gross requirements and netting can be simplified by using

  1. Low-level codes
  2. Planning horizon
  3. Time buckets
  4. Action buckets

Answer(s): A



The material planner works with the type of orders

  1. Four
  2. Three
  3. Seven
  4. Two

Answer(s): B



The orders are automatically scheduled and controlled by the computer are the orders called:

  1. Planned orders
  2. Computer generated order
  3. Firms planned order
  4. All of the Above

Answer(s): A