The next job to be performed was selected because it had the least amount of operation time prior to the due date. Which of the following priority sequencing rules was being used?

  1. Slack time per operation
  2. Shortest operation time
  3. Critical ratio
  4. Slack time per order

Answer(s): B



Control charts are used to do which of the following?

  1. Determine preventative maintenance schedules
  2. Display variation of the production process
  3. Determine the percentage of output within specification limits
  4. Verify ongoing process capability

Answer(s): B



One of the main benefits of the A3 problem solving method is:

  1. coaching.
  2. a statistical approach.
  3. a kaizen event.
  4. voice-of-the-customer data.

Answer(s): A



Based on the data provided, assume that time available per day is 840 minutes. What is the takt time per unit of demand?

  1. 84.0 minutes
  2. 22.1 minutes
  3. 2.21 minutes
  4. 8.4 minutes

Answer(s): B