Toggle Navigation
Braindumps
Contact Us
Register
Login
CompTIA
Checkpoint
ISC
HP
Dell
EC-Council
EXIN
Fortinet
ITIL®
Juniper
PMI
Microsoft
VMware
Avaya
Google
Salesforce
Amazon
Palo Alto Networks
Certiport
ISC2
All Vendors
Home
Exams
Avaya
7003-1
Exam Dumps
Free 7003-1 Exam Braindumps
Pass your 7003-1 Avaya Communication Server 1000 for Avaya Aura Implementation Exam exam with these free Actual Questions and Answers
Exam Code:
7003-1
Exam Title:
7003-1 Avaya Communication Server 1000 for Avaya Aura Implementation Exam
Exam Provider:
Avaya
Exam Questions:
65
Updated On:
16-Jun-2025
5447
5447 students passed the 7003-1 Exam
96.4%
Average score for the 7003-1 Exam
65
Questions and Answers in this 7003-1 Exam
92% of students found these exam questions nearly identical to real exam.
QUESTION:
1
A technician deployed a Communication Server 1000E with dual homing feature configured.
Both the T and 2T ports are connected on the media Gateway Controller (MGC) one connection
is active to avoid network loops.
Which two statements are true, if the connection to the active port on the MGC is host?
(Choose two)
A. The MGC wil issue a link down error.
B. The MGC wil switch to the active pert.
C. The MGC and CPPM wil have no loss of service.
D. The MGC wil switch to the active port after 12 seconds.
Answer(s):
B, C
QUESTION:
2
A customer has deployed a Communication Server 100 Rls. 7x system at their site. The
technician has been asked to add the Cal pickup feature to the 100 IP telephone in the sales
department. The customer wants to be sure active calls not lost when the changes are made.
Which Phones Configuration feature can be enabled that wil ensure changes to the telephone
are not transmitted to the call server until the telephone are busy?
A. Bulk change
B. Courtesy change
C. Group change
D. Template change
Answer(s):
B
QUESTION:
3
A customer wants to build a new Ip node on their Communication Server (CS) 1000E system
with three Signaling Servers. This node will support virtual trunks, IP media services, TPS and
personnel directories. A technician logs into Elements manager to complete the configuration,
after creating and saving the node configuration, the transfer now option chosen, then the
servers are selected, the start sync is selected followed by restart application.
What is expected outcome from the system?
A. The node file wil be transferred from Signaling Servers to the call servers, and INI files wil
be transferred from the call server to the selected servers.
B. The node file wil be transferred from Call Servers to the Signaling servers, and the INI files
wil be transferred from the Call Servers to the selected servers.
C. The node file wil be transferred from Signaling Servers to the Call Server, and the INI files
wil be transferred from Call Servers to the Signaling servers.
D. The node wil be transferred from Element manager to the call server, and INI files wil be
transferred from Element manager to Cal Server.
Answer(s):
B
QUESTION:
4
Post your Comments and Discuss Avaya 7003-1 exam with other Community members:
Comments:
Name: