What spaces are typically grouped together in a multistory building's service core?

  1. lobby, elevator, corridors, stairs
  2. stairs, elevator, toilet rooms, supply closet
  3. kitchen, toilet rooms, loading docks, laundry
  4. janitors closets, electrical closets, data rooms, HVAC

Answer(s): B



After completion of a project, the client spills coffee on their new lobby sof

  1. Where would the client look for information on how to remove the stain?
  2. product data sheet
  3. warranty information
  4. maintenance manual
  5. furniture specification

Answer(s): C



During construction, the general contractor notices conflicting information between the construction drawings and the specifications. The FIRST step the contractor should take is to

  1. issue a change order
  2. make an interpretation
  3. notify the owner of the discrepancy
  4. notify the designer of the discrepancy

Answer(s): D



A project is utilizing existing millwork with new custom countertops.
Who is responsible to field verify the existing conditions to generate shop drawings for the new countertops?

  1. owner
  2. installer
  3. designer

Answer(s): B



Permit application requirements are developed by the

  1. local jurisdiction of the project
  2. International Code Council (ICC)
  3. general contractor for the project
  4. National Fire Protection Association (NFPA)

Answer(s): A