XYZ Ltd is a highly profitable leading industrial distributor with over 60,000 products and an enviable record for customer service. After undertaking preliminary discussions it was decided to analyse the value-adding activities that contribute to XYZ's flagship products. The company is conducting which of the following activities?
Answer(s): B
According to Hines and Rich, value stream refers to specific parts of the firms that actually add value to the specific product or service under consideration. XYZ Ltd is mapping the value stream by analysing the value-adding activities that contribute to their most important product. Postponement is a business strategy which maximizes possible benefit and minimizes risk by delaying further investment into a product or service until the last possible moment. An example of this strategy is Dell Computers' build-to-order online store. One of the earliest references to the concept was in a paper by Zinn and Bowersox in the Journal of Business Logistics. They highlighted five types: Labelling, Packaging, Assembly, Manufacturing and Time postponements. ) (signboard or billboard in Japanese) is a scheduling system for lean manufacturing and Kanban ( just-in-time manufacturing (JIT). Taiichi Ohno, an industrial engineer at Toyota, developed kanban to improve manufacturing efficiency. Kanban is one method to achieve JIT. The system takes its name from the cards that track production within a factory. For many in the automotive sector, kanban is known as the "Toyota nameplate system".Put simply, silo working occurs when several departments or groups within that organisation do not want to share information or knowledge with other individuals they work with.
CIPS study guide page 128-129LO 2, AC 2.3
Which of the following can replace pallets as bases for unit loads but they require push pull acces- sories to retrieve or discharge unit load?
Answer(s): D
The system of slip sheet load handling involves the use of a thin sheet of material, the slip sheet, as a base on which items are assembled as a unit load for handling, storage, and transport. The slip sheet is used in conjunction with a pallet, if desired, at certain stages in the distribution cycle. If all lift trucks in the cycle are equipped with the proper attachment, an appropriate slip sheet is the only material handling base required. Slip sheet requires special push pull accessories and usually use thin and wide forks.Skids are generally described as single-deck pallets and do not have bottom flatted layer which makes them less bulky and cheaper than conventional pallets but also less universal in their use.Shrink wrap, also referred to as shrink film or shrink wrap, is a versatile polymer material used for the packaging of finished goods. Heat is applied to the film by either a conveyor heat tunnel or an electric or gas heat gun which catalyzes the film to shrink tightly around the item placed within. This process results in a clear, durable barrier of protection around the product. Post pallets have a simple metal structure with four uprights and substantial feat to take the load. These may be free standing, but many are designed for the feet to interlock with the posts of another post pallet so that the stack can be created.
CIPS study guide page 62LO 1, AC 1.3
What are the contents of master production schedule in MRP system?
A master production schedule (MPS) is a plan for individual commodities to be produced in each time period such as production, staffing, inventory, etc.[1] It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded.[2] This plan quantifies significant processes, parts, and other resources in order to optimize production, to identify bottlenecks, and to anticipate needs and completed goods. Since a MPS drives much factory activity, its accuracy and viability dramatically affect profitability. Typical MPSs are created by software with user tweaking.
CIPS study guide page 116-119LO 2, AC 2.3
An organisation may incur additional costs in stockout events.Which of the following is an exam-ple of costs of inventory stockouts?
Stockout is a situation where an inventory item is not available when required. The costs associated with a stockout include the following:- Lost of production output - there will be no production until the stockout is resolved (new stock is acquired). For factory operating 24/7 with no spare capacity, this lost output will not be able to be recovered.- Costs of machine downtime and of overhead spread over a reduced level of output- Costs of any action required to deal with the stockout...- Loss of customer goodwill through inability to supply or late delivery- Loss of sales or new orders- Loss of market creditability
CIPS study guide page 101-102LO 2, AC 2.2
Can RFID tags work when they are attached to metal surfaces or embedded within metal products?
Answer(s): A
Mounting or embedding RFID tags on metal can be tricky. Metal surfaces reflect energy emitted from RFID readers and create interference for RFID tag antennas, which means the tag isn't able to receive power and transmit information; however, specific RFID tags will work around metal sur-faces. RFID companies have patented technology that allows RFID to work when attached to metal surfaces and even embedded within metal products. As long as you choose the correct RFID equipment for your environment and application, you won't need to worry about interference from metal.
CIPS study guide page 49-50LO 1, AC 1.2