Company XYZ is a candy manufacturer. Company XYZ makes a batch of 1,000 Christmas candy canes that are no longer edible after December 31. Company XYZ is able to sell 750 canes of the batch, but the other 250 are sitting in the warehouse. December 31 comes, and these candy canes is no longer sell-able. The batch of 250 candy canes belongs to which type of inventory?
Answer(s): A
Obsolescent stock is stock, usually finished goods, which is in good condition and satisfactory working but for which demand is irreversibly falling towards zero. Once this demand reaches zero the stock can be considered 'obsolete'. It cannot be used or sold in its current state. Food ingredients (like candy canes) which are out of date are another example.
CIPS study guide page 86-88LO 2, AC 2.1
The purchase-order lead time is the...?
Answer(s): C
Purchase order lead time (POLT) refers to the number of days from when a company places an order for production inputs it needs, to when those items arrive at the manufacturing plant.LO 2, AC 2.3
XYZ Ltd is a retailer in the US. Their customers' demand for Thanksgiving and Christmas decora-tions usually rises in the end of the year. This irregular demand results in more required storage space for finished goods during peak seasons.Which of the following are possible solutions for dealing with required additional space?1. Maximising aisle width2. Keeping high buffer stock throughout the year3. Maximising flexibility in warehouse layout4. Installing mezzanine floor
Answer(s): D
Possible solutions to the high irregular or seasonal demand problems are listed below:- Take advantage of the height of the warehouse- Mezzanine floor- High racking system (increase storage capacity but require high-reach material handling equip- ment)- Eliminate dead stock or inventory- Improve material flow- Improve storage location method- Consider using aisle space during demand peak- Narrow aisles between racks (require narrow handling equipment) - Carousel-type storage system- Auto-storage and retrievals system (ASRS)
CIPS study guide page 22LO 1, AC 1.1
The minimal total cost is always achieved when there is only one warehouse. Is this statement true?
The total cost of storage consists of two different costs:- The cost of warehouses: each one has a different cost, and each has the cost of stock-holding and stock management included- The transport costs: the total transport cost reduces as further warehouses mean shorter final delivery to the customers.Depending on each situation, the optimal number of warehouses varies. Generally, more facilities will increase the cost of warehouses while reduce the transport costs and vice versa.
CIPS study guide page 6-7LO 1, AC 1.1
Toll Group has thousands of end-of-life IT assets that need to be disposed of. The senior manage- ment of Toll Group is largely concerned about sustainability in waste management, especially electronic waste. Before selecting a supplier to manage the process, the procurement team is required to assess the environmental risks regarding disposal of the assets. Risk assessment is basically based on the measurement of which factors?1. Impact2. Reward3. Surveillance4. Likelihood
All risk management processes follow the same basic steps, although sometimes different jargon is used to describe these steps. Together these 5 risk management process steps combine to deliver a simple and effective risk management process.Step 1: Identify the Risk. You and your team uncover, recognize and describe risks that might affect your project or its outcomes. There are a number of techniques you can use to find project risks. During this step you start to prepare your Project Risk Register. Step 2: Analyze the risk. Once risks are identified you determine the likelihood and consequence of each risk. You develop an understanding of the nature of the risk and its potential to affect pro-ject goals and objectives. This information is also input to your Project Risk Register. Step 3: Evaluate or Rank the Risk. You evaluate or rank the risk by determining the risk magni-tude, which is the combination of likelihood and consequence. You make decisions about whether the risk is acceptable or whether it is serious enough to warrant treatment. These risk rankings are also added to your Project Risk Register.Step 4: Treat the Risk. This is also referred to as Risk Response Planning. During this step you assess your highest ranked risks and set out a plan to treat or modify these risks to achieve acceptable risk levels. How can you minimize the probability of the negative risks as well as enhancing the opportunities? You create risk mitigation strategies, preventive plans and contingency plans in this step. And you add the risk treatment measures for the highest ranking or most serious risks to your Project Risk Register.Step 5: Monitor and Review the risk. This is the step where you take your Project Risk Register and use it to monitor, track and review risks.
- What are the 5 Risk Management Steps in a Sound Risk Management Process?- CIPS study guide page 192-193LO 3, AC 3.3