Free GMAT SECTION 2: QUANTITATIVE Exam Braindumps
GMAT Section 2: Quantitative Questions 371–375 (page: 76)

Updated On: 9-Feb-2026

20 beavers, working together in a constant pace, can build a dam in 3 hours.
How many hours will it take 12 beavers that work at the same pace, to build the same dam?

  1. 5.
  2. 2.
  3. 8.
  4. 4.
  5. 6.

Answer(s): A

Explanation:

20 beavers worked 3 hours; therefore 60 hours of work were needed to build the dam. 60 hours / 12 beavers = 5 hours of work to complete the same dam.



B and A are consecutive numbers. If A + B + X =15 than what is true about X?

  1. It can be equally divided by 5.
  2. It can be equally divided by 3.
  3. Positive.
  4. Even.
  5. Odd.

Answer(s): D

Explanation:

A + B is an odd number; in order for the sum to be equal to 15 X must be an even number.



A and B are numbers between 0 and 9. When multiplying 56 by another number the result is 1AB. which of the following can represent A?

  1. 8.
  2. 2.
  3. 6.
  4. 4.
  5. 5.

Answer(s): C

Explanation:

We have two choices: 56 x 2 = 112 or 56 x 3 = 168. Therefore, A could be 1 or 6. The answer is A = 6.



Q and R are numbers between 0 and 9. When multiplying 71 by another double-digit number the result is 7PQ. Which of the following could represent Q?

  1. 1.
  2. 8.
  3. 3.
  4. 5.
  5. 4.

Answer(s): A

Explanation:

We have two choices: 71 x 10 = 710 or 71 x 11 = 781. Therefore, Q can be 0 or 1. The answer is A.



A and B are numbers between 1 and 9. What is ABAB/AB? (AB is a two-digit number and ABAB is a 4-digit number).

  1. 11
  2. BAB
  3. 101
  4. AB
  5. 100.

Answer(s): C

Explanation:

Plug in numbers: A = 1, B = 2 AB = 12, ABAB = 1212. 1212/12 = 101.



Viewing page 76 of 147
Viewing questions 376 - 380 out of 745 questions


Post your Comments and Discuss GMAT GMAT SECTION 2: QUANTITATIVE exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!