A customer needs to deploy additional management components, such as vCenter Server and HPE Global Dashboard. According to HPE best practices, how should an integrator deploy these components?

  1. Deploy VMware HA cluster on two dedicated management servers, then deploy management components to this cluster.
  2. Deploy vCenter Server as a virtual machine on the Hyper-V host and HPE Global Dashboard to the domain controller.
  3. Install vCenter Server on the domain controller, then deploy HPE Global Dashboard to the HPE Composer or HPE OneView appliance.
  4. Deploy vCenter Server to any Windows machine, and install HPE Global Dashboard on the same server.

Answer(s): B



During a first-time installation of HPE Synergy, an external monitor is not available to the integrator. Which approach should the integrator take to perform the first-time setup?

  1. Download MSTCS, connect the laptop to the front Panel Ethernet port, and open a RDP Session to 192.168.10.1 on port 443.
  2. Download VNC Viewer, connect the laptop to the front Panel Ethernet port, and open a VNC-connection to 192.168.10.1 on port 5900.
  3. Download Telnet, connect the laptop to the front Panel Ethernet port, and open a connection to 192.168.10.1 on port 8443.
  4. Download PuTTY, connect the laptop to the front Panel Ethernet port, and open an SSH connection to 192.168.10.1 on any port (default is 22).

Answer(s): B



A customer has a datacenter with 3-frame Master/Satellite Synergy solution. They plan to add two additional frames to the remote datacenter, but they want to have a single management tool.
How should the integrator set up the management of the datacenter?

  1. Add two frames from the remote datacenter as remote enclosures using existing Composer
  2. Install one Composer in every frame in both local and remote datacenter
  3. Deploy one Composer in each site and link them together
    D. Connect the management links with fibre cables if the distance between datacenters is more than 500m

Answer(s): A



An integrator needs to configure a set of networks for Synergy compute nodes to send data to devices outside of a Synergy frame. How should the integrator complete the task?

  1. Add the network to an interconnect bay within a Logical Enclosure (LE)
  2. Add the networks to an uplink set within a Logical Interconnect Group (LIG)
  3. Add the networks to an Enclosure Group (EG)
  4. Add the network sets to a Logical Interconnect Group (LIG)

Answer(s): A