Free HPE0-S58 Exam Braindumps (page: 9)

Page 8 of 25

A customer needs to expand a single-frame Synergy solution to two frames.
What should the integrator do to establish a proper management network for the two frames?

  1. Connect the RJ-45 management ports of the Virtual Connect modules together with redundant CAT6A cables.
  2. Disconnect the existing management ring, and cable the Frame Link Modules in the first frame to the Frame Link Modules in the added frame.
  3. Connect the RJ-45 front panel connectors on the two frames together with a single CAT6A cable.
  4. In the Synergy console, select the Frame Link Modules in the new frame and define the connection between them.

Answer(s): D



A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.
Which procedure should the integrator use to address the customer’s concern?

  1. Connect the RJ-45 front ports of each frame to an external switch. Then, connect the uplink from the external switch into the customer’s management network.
  2. Connect FLMs from all frames to two external switches for redundancy. Then, connect the two uplinks from the two switches into the customer’s management network.
  3. Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then, connect the uplink from the two switches into the customer’s management network.
  4. Connect FLMs from all frames into a management ring. Then, connect the management ring to the customer’s management network using two uplinks.

Answer(s): D



A customer wants to expand their existing cluster using the Grow Cluster functionality from OneView for vCenter Server. Which OS build plan managed by HPE OneView for vCenter Server can the customer use?

  1. ICsp-Based Deployment
  2. iLO Federation-Based Deployment
  3. Image Streamer-Based Deployment
  4. PXE-Based Deployment

Answer(s): A


Reference:

https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00036306en_us&docLocale=en_US



A Synergy integrator is unable to assign an HPE 3PAR Virtual Volume to a new server profile in HPE Composer. The Virtual Volume has been previously assigned to another profile. Which setting in HPE Composer is preventing the integrator from assigning the volume to the new profile?

  1. private, in the volume properties
  2. shared, in the volume properties
  3. private, in the storage pool properties
  4. shared, in the storage pool properties

Answer(s): D






Post your Comments and Discuss HP HPE0-S58 exam with other Community members:

HPE0-S58 Discussions & Posts