Which system affects the PUE most in Data Center.

  1. Power Distribution system
  2. Cooling System
  3. N/A
  4. Lighting system

Answer(s): B



How many power inputs does an RH2288 server support places.

  1. 1
  2. 2
  3. 3
  4. 4

Answer(s): B



When connecting UPS5000-E in parallel, the parallel cables are not required to connect in a loop.

  1. TRUE
  2. FALSE

Answer(s): B



If the customer load cannot be power-off, what should be taken care when closing the maintenance bypass switch?

  1. The maintenance bypass switch can also be closed in the inverter power supply mode
  2. Turn off the inverter, let the UPS be in bypass power supply mode and then close the maintenance bypass switch
  3. First perform EPO then close maintenance switch
  4. Close the maintenance switch first and then execute the EP

Answer(s): A,B,D



Page 4 of 61



Post your Comments and Discuss Huawei H12-425 exam with other Community members:

Temesgen fentabil commented on June 13, 2024
It is good h12-425 exam related questions
Anonymous
upvote