When the air conditioning outdoor of Huawei air-cooled air conditioner is installed horizontally, it is required to be (___________________) mm from the wall or obstacle.
Answer(s): D
FusionModule1000 is an indoor prefabricated all in-one data center solution.
Answer(s): B
FusionModule1000A All-in-One Prefabricated Data Center is a green and reliable outdoor data center solution.
After the UPS5000-E system is installed, which of the following items need to be checked?
Answer(s): A,B,C,D
Backup time of battery depends on discharge current of battery.
Answer(s): A