ISTQB CT-TAE Exam
Certified Tester Test Automation Engineer (Page 9 )

Updated On: 1-Feb-2026

As the TAE, you are working with the organisation's Test Manager to decide which external metrics and which internal metrics should be gathered for the new TAS.

Which of the following represents the BEST internal metric that would help measure the quality of the TAS and the number of problems associated with the TAS?

  1. The average maintenance cost to keep an automated test in sync with the SUT
  2. The number of hours of manual test effort saved by implementing a TAS
  3. A measure of defect density within the TAS automation code
  4. A measure of how many automated tests pass and fail

Answer(s): C



What is the PRIMARY advantage of using abstraction in the TAA?

  1. It makes it more flexible for future reuse and improvements
  2. It requires a higher skill level to implement
  3. It ensures that any scripting method will be supported
  4. It improves the performance of the TAS

Answer(s): A


Reference:

https://www.techtarget.com/whatis/definition/abstraction



Which of the following describes how a test execution report is likely to be used?

  1. To understand which test step caused the failure in a test case
  2. To identify problematic areas of the SUT by keeping a history showing which test cases fail the most
  3. To measure coverage of the test basis by a test suite
  4. To record how a test case failure has been fixed

Answer(s): B


Reference:

https://www.guru99.com/how-test-reports-predict-the-success-of-your-testing- project.html



When the SUT provides insight into the behaviour of the system, providing the users the with the status of the various actions performed so that they can check that expected behaviour equals actual behaviour, what is this called?

  1. Portability.
  2. Maintainability.
  3. Observability.
  4. Controllability.

Answer(s): C


Reference:

https://www.toptal.com/designers/ux-consultants/how-to-conduct-usability-testing-in-6- steps



You are implementing test automation for a project that has a business critical application A test execution tool is being used to run automated regression tests. The results from the test execution tool are very important and need to be 100% accurate.

You want to merge the test automation results with the test management system that also records the manual test results so that managers can make informed decisions about the progress quickly.

Which layer of the gTAA will be used to ensure the proper reporting occurs and the interfaces to the test management system are handled?

  1. The reporting layer
  2. The logging layer
  3. The execution layer
  4. The adaptation layer

Answer(s): A



Viewing page 9 of 17
Viewing questions 41 - 45 out of 119 questions



Post your Comments and Discuss ISTQB CT-TAE exam prep with other Community members:

Join the CT-TAE Discussion