Testing Process
Assume you are the Test Manager for a new software release of an e-commerce application.
The server farm consists of six servers providing different capabilities. Each capability is provided through a set of web services.
The requirements specification document contains several SLAs (Service Level
Agreements) like the following:
SLA-O01: 99.5 percent of all transactions shall have a response time less than five seconds under a load of up-to 5000 concurrent users
The main objective is to assure that all the SLAs specified in the requirements specification document will be met before system release. You decide to apply a risk-based testing strategy and an early risk analysis confirms that performance is high risk. You can count on a well-written requirements specification and on a model of the system behavior under various load levels produced by the system architect.

Which of the following test activities would you expect to be the less important ones to achieve the test objectives in this scenario?

  1. Perform unit performance testing for each single web service
  2. Monitor the SLAs after the system has been released into the production environment
  3. Perform system performance testing, consisting of several performance testing sessions, to verify if all the SLAs have been met
  4. Perform static performance testing by reviewing the architectural model of the system under various load level

Answer(s): B



You are about to release a test progress report to a senior manager, who is not a test specialist. Which of the following topics should NOT be included in the test progress report? 1 credit

  1. Product risks which have been mitigated and those which are outstanding.
  2. Recommendations for taking controlling actions
  3. Status compared against the started exit criteria
  4. Detailed overview of the risk-based test approach being used to ensure the exit criteria to be achieved

Answer(s): D



Explain how the above mentioned report may differ from a report that you produce for the project manager, who is a test specialist Select TWO items from the following options that can be used to report to the project manager and would not be included in a report to senior management. 1 credit

  1. Show details on effort spent
  2. List of all outstanding defects with their priority and severity
  3. Give product risk status
  4. Show trend analysis
  5. State recommendations for release

Answer(s): A,B



Consider the typical objectives of testing. Which of the following metrics can be used to measure the effectiveness of the testing process in achieving one of those objectives? 1 credit

  1. Average number of days between defect discovery and resolution
  2. Percentage of requirements covered
  3. Lines of code written per developer per day
  4. Percentage of test effort spent on regression testing

Answer(s): B



You have been given responsibility for the non-functional testing of a safety-critical monitoring & diagnostics package in the medical area. Which of the following would you least expect to see addressed in the test plan? 1 credit

  1. Availability
  2. Safety
  3. Portability
  4. Reliability

Answer(s): C