Which of the following is the main purpose of the component build and integration strategy?

  1. to ensure that all of the small components are tested
  2. to ensure that the system interfaces to other systems and networks
  3. to ensure that the integration testing can be performed by a small team
  4. to specify how the software should be divided into components
  5. to specify which components to combine when, and how many at once

Answer(s): E



View Related Case Study

What should be the MAIN objective during development testing?

  1. To cause as many failures as possible so that defects in the software are identified and can be fixed
  2. To confirm that the system works as expected and that requirements have been met
  3. To assess the quality of the software with no intention of fixing defects
  4. To give information to stakeholders of the risk of releasing the system at a given time

Answer(s): A



View Related Case Study

Which of the following is not a part of the Test Implementation and Execution Phase?

  1. Creating test suites from the test cases
  2. Executing test cases either manually or by using test execution tools
  3. Comparing actual results
  4. Designing the Tests

Answer(s): D



View Related Case Study

Designing the test environment set-up and identifying any required infrastructure and tools are a part of which phase:

  1. Test Implementation and execution
  2. Test Analysis and Design
  3. Evaluating the Exit Criteria and reporting
  4. Test Closure Activities

Answer(s): B