ISTQB-ISEB Certified Tester Foundation Level Questions 164–168 (page: 23)

Updated On: 10-Feb-2026
View Related Case Study

Which of the following is a non-functional requirement?

  1. The system will enable users to buy books.
  2. The system will allow users to return books.
  3. The system will ensure security of the customer details.
  4. The system will allow up to 100 users to log in at the same time.

Answer(s): D

Explanation:

The other options are functional requirements. Note that security is regarded as a functional requirement in this syllabus.



View Related Case Study

Which of the following statements are true?

(i) For every development activity there is a corresponding testing activity.
(ii) Each test level has the same test objectives.
(iii) The analysis and design of tests for a given test level should begin after the corresponding development activity.
(iv)Testers should be involved in reviewing documents as soon as drafts are available in the development life cycle.

  1. (i) and (ii)
  2. (iii) and (iv)
  3. (ii) and (iii)
  4. (i) and (iv)

Answer(s): D

Explanation:

Option (ii) is incorrect: each test level has a different objective. Option (iii) is also incorrect: test analysis and design should start once the documentation has been completed.



View Related Case Study

Which of the following statements are correct for walkthroughs?

(i) Often led by the author.
(ii) Documented and defined results.
(iii) All participants have defined roles.
(iv) Used to aid learning.
(v) Main purpose is to find defects.

  1. (i) and (v) are correct.
  2. (ii) and (iii) are correct.
  3. (i) and (iv) are correct.
  4. (iii) and (iv) are correct.

Answer(s): C



View Related Case Study

Which of the following has the typical formal review activities in the correct sequence?

  1. Kick-off, review meeting, planning, follow-up.
  2. Kick-off, planning, review meeting, re-work.
  3. Planning, kick-off, individual preparation, review meeting.
  4. Planning, individual preparation, follow-up, re-work.

Answer(s): C

Explanation:

The correct sequence is: planning, kick-off, individual preparation, review meeting, re-work, follow- up. All of the other options have either the activities in the wrong order or activities missing from the strict flow.



View Related Case Study

Which of the following statements are true?

(i) Defects are likely to be found earlier in the development process by using reviews rather than static analysis.
(ii) Walkthroughs require code but static analysis does not require code.
(iii) Informal reviews can be performed on code and specifications.
(iv) Dynamic techniques are generally used before static techniques.
(v) Dynamic techniques can only be used after code is ready to be executed.

  1. (i), (ii), (vi).
  2. (ii), (iii), (v).
  3. (i), (iv), (v).
  4. (i), (iii), (v).

Answer(s): D

Explanation:

The other answers are incorrect because:
(ii) Walkthroughs do not require code and static analysis does require code. (iv) Static techniques do not execute the code and therefore can be run before and after the code is ready for execution.



Viewing page 23 of 69
Viewing questions 111 - 115 out of 338 questions