Free ITIL® ISEB-SWT2 Exam Braindumps (page: 3)

93.3% Passing Rate DOWNLOAD PDF EXAM
338 Questions & Answers
Page 3 of 86
View Related Case Study

Since the system is in the medical domain and therefore in the safety critical area, testing needs to be rigorous and evidence is required that the system has been adequately tested. Identify THREE measures that would typically be part of the test approach in this domain and which are not always applicable in other domains! 1 credit

  1. High level of documentation
  2. Failure Mode and Effect Analysis (FMEA) sessions
  3. Traceability to requirements
  4. Non-functional testing
  5. Master test planning
  6. Test design techniques
  7. Reviews

Answer(s): A,B,C



View Related Case Study

A test log is one of the documents that need to be produced in this domain in order to provide evidence of testing. However, the level of detail of test logs can vary.
Which of the following is NOT an influencing factor for the level of detail of the test logs being produced? 1 credit

  1. Level of test execution automation
  2. Test level
  3. Regulatory requirements
  4. Experience level of testers

Answer(s): D



View Related Case Study

Considerable attention will be given in this project to defining exit criteria and on reporting back on their status.
Which combination of TWO exit criteria from the list would be best to use? 1 credit

I). Total number of defects found
II). Percentage of test cases executed
III). Total test effort planned versus total actual test effort spent IV. Defect trend (number of defects found per test run over time

  1. (i) and (ii)
  2. (i) and (iv)
  3. (ii) and (iii)
  4. (ii) and (iv)

Answer(s): D



View Related Case Study

Which option is part of the `implementation and execution' area of the fundamental test process?

  1. Developing the tests.
  2. Comparing actual and expected results.
  3. Writing a test summary.
  4. Analyzing lessons learnt for future releases.

Answer(s): B

Explanation:

A . is part of `Analysis and design'.
C . is part of `Evaluating exit criteria and reporting'.
D . is part of `Test closure activities'.






Post your Comments and Discuss ITIL® ISEB-SWT2 exam prep with other Community members: