A company implements Dynamics 365 Supply Chain Management.

Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements:

Locate a warehouse at the subcontractor building.

Support picking and shipping activity tracking.

Associate costs of transporting materials between the locations in the cost of the finished product.

You need to modify the production flow.

Which three actions should you perform? Each correct answer presents part of the solution.

Note: Each correct selection is worth one point.

  1. Create a resource and work cell resource group for the subcontractor.
  2. Modify the overflow work operation and associate it with the subcontractor.
  3. Create transfer activities and assign them to the subcontractor.
  4. Modify the overflow work activity and assign it to the subcontractor.
  5. Create a new production flow version.

Answer(s): A,B,C


Reference:

https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/manage-subcontract-work- production



DRAG DROP

A manufacturer sends wiring harnesses to a vendor to be soldered to a connector. You create the subcontracting process in the bill of materials (BOM) and route to account for the items sent to the vendor.

You need to set up a new item model group for the service item.

Which three actions should you perform? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Select and Place:

  1. See Explanation section for answer.

Answer(s): A

Explanation:


Reference:

https://timsaxblog.wordpress.com/2015/08/18/subcontract-purchase-order-receipt-with-route-card-posting/



DRAG DROP

A company uses Process manufacturing.

Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.

After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.

You need to split the batch order into two orders.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Select and Place:

  1. See Explanation section for answer.

Answer(s): A

Explanation:



You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item.

This item has the following Lean setup:

The setup uses a Lean schedule group with a throughput ratio = 2. The process activity tied to production flow has the following runtime activity times: time = 3 min, per quantity = 1.
The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8 hour day).
The throughput is 10 per hour.

You need to set up a Discrete operation to mirror the item's production flow activity.

What should you do?

  1. Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 1.
  2. Create a route with a runtime = 1, a process quantity = 6, and the operation's hours/time = 1.
  3. Create a route with a runtime = 10, a process quantity = 6, and the operation's hours/time = 1.
  4. Create a route with a runtime = 1, a process quantity = 1, and the operation's hours/time = 1.

Answer(s): A

Explanation:

Correct:
* Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 1.
Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 1. This setup will match the throughput ratio of the Lean setup, which is 2. Since the Lean process activity has a runtime of 3 minutes per quantity, the Discrete operation should have twice the runtime, or 6 minutes per quantity. The process quantity and operation's hours/time are set to 1 to match the per quantity and time values of the Lean process activity.
Incorrect:

* Create a route with a runtime = 1, a process quantity = 1, and the operation's hours/time = 0.0167 (e.g. 1 hour/60 minutes).
* Create a route with a runtime = 1, a process quantity = 1, and the operation's hours/time = 1.
* Create a route with a runtime = 1, a process quantity = 6, and the operation's hours/time = 0.0167 (e.g. 1 hour/60 minutes).
* Create a route with a runtime = 1, a process quantity = 6, and the operation's hours/time = 1.
* Create a route with a runtime = 10, a process quantity = 6, and the operation's hours/time = 1.
* Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 0.0167 (e.g. 1 hour/60 minutes).


Reference:

https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/tasks/define-lean-schedule- groups



A company uses Lean manufacturing processes with Kanban boards.

When unexpected transfer jobs occur, the boards do not clear properly.

You need to ensure that the boards clear properly.

What are two possible ways to clear the board? Each correct answer presents a complete solution.

Note: Each correct selection is worth one point.

  1. Remove the planned Kanban job.
  2. Change unplanned to planned.
  3. Delete the unplanned job.
  4. Revert the planned Kanban job status.

Answer(s): A,D

Explanation:

D: Remove a kanban job from the schedule
This procedure focuses on removing a planned process kanban job from the schedule by reverting the job status to Not planned.
Remove the planned kanban job from the schedule
1.In the list, find and select the desired record.
2.Select a job that has the Planned status, for example, a job from December 19, 2012.
3.On the Action Pane, click Plan.
4.Click Revert job status.
5.Click OK.
This will revert the current job status from 'Planned' to 'Not planned' and remove it from the process board.


Reference:

https://learn.microsoft.com/en-us/dynamics365/supply-chain/production-control/tasks/remove-kanban-job- schedule



Viewing page 27 of 55
Viewing questions 131 - 135 out of 270 questions