Free PL-600 Exam Braindumps (page: 20)

Page 20 of 49

You are designing a Microsoft Power Platform solution to include several canvas apps. You are using Azure DevOps for solution management and deployment. You deploy managed solutions into production.

You need to update the solution number when the solution is exported from the development environment.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

  1. Set the solution version number by using Solution Packager.
  2. Set the solution version number when exporting the solution from the solutions page in the make.powerapps.com portal.
  3. Set the solution version number in the Azure DevOps build pipeline.
  4. Set the canvas app version number in Power Apps Studio.

Answer(s): B,C

Explanation:

B: There are times when you need to update an existing managed solution. To update the solution, follow these steps:

1. Open the unmanaged solution in your development environment and create new or add and remove the existing components that you want.

2. Increment the version number when you export the solution as a managed solution.



3. Apply the upgrade or update in the target environment

C: While version number can be hardcoded in the pipeline, it is recommended to use an Azure DevOps pipeline variable like BuildId. This provides options to define the exact shape of version number under the "Options" tab, for example: $(Year:yyyy)-$(Month:MM)-$(Day:dd)-$(rev:rr)-3

This definition can then be used in the Set Solution Version task by setting the Version Number property with: $(Build.BuildId) instead of hard coding 20200824.0.0.2.


Reference:

https://learn.microsoft.com/en-us/power-apps/maker/data-platform/update-solutions
https://learn.microsoft.com/en-us/power-platform/alm/devops-build-tool-tasks
https://learn.microsoft.com/en-us/power-platform/alm/use-source-control-solution-files



DRAG DROP (Drag and Drop is not supported)
A company plans to import one million records of legacy data into Microsoft Power Platform. You configure the solution in a test environment by using custom tables modeled to new business processes. You load the legacy data into the custom tables.

You monitor the test environment during the test uploads and sequence the data loads only outside of business hours.

You need to determine how to deploy all the components and legacy data into production.

Which three actions should you perform in sequence?

To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

  1. See Explanation section for answer.

Answer(s): A

Explanation:





Step 1: Add dataflows to the solution
Configuring incremental refresh for dataflows
A dataflow can contain many entities. Incremental refresh is set up at the entity level, allowing one dataflow to hold both fully refreshed entities and incrementally refreshed entities.

To set up an incremental-refreshed entity, start by configuring your entity as you would any other entity.

Step 2: Create an incremental refresh schedule
After the dataflow is created and saved, select Incremental refresh Incremental refresh. in the entity view, as shown in the following image.


Step 3: Import the solution to the production environment
Import the solution from the development to the production environment.

Note: Using incremental refresh with dataflows
With dataflows, you can bring large amounts of data into Power BI or your organization's provided storage. In some cases, however, it's not practical to update a full copy of source data in each refresh. A good alternative is incremental refresh, which provides the following benefits for dataflows:

Refresh occurs faster: Only data that's changed needs to be refreshed. For example, refresh only the last five days of a 10-year dataflow.
Refresh is more reliable: For example, it's not necessary to maintain long-running connections to volatile source systems.
Resource consumption is reduced: Less data to refresh reduces overall consumption of memory and other resources.
Incremental refresh is available in dataflows created in Power BI and dataflows created in Power Apps.


Reference:

https://learn.microsoft.com/en-us/power-query/dataflows/incremental-refresh



DRAG DROP (Drag and Drop is not supported)
A company uses Microsoft Power Platform solutions.

The company plans to set up application lifecycle management (ALM) capabilities to store the solutions in source control, which will be used to automate the release process.

You need to set up the initial ALM infrastructure to store the solutions in source control.
Which four actions should you perform in sequence?

To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

  1. See Explanation section for answer.

Answer(s): A

Explanation:





Step 1: Create an Azure DevOps Project.
If you're using the segmented code component solution project, you can build the project inside an Azure DevOps Pipeline (using Microsoft Power Platform Build Tools) or GitHub Pipeline (using GitHub Actions for Microsoft Power Platform).

Step 2 Install the Microsoft Power Platform Build Tools.
After installation, all tasks included in the Microsoft Power Platform Build Tools will be available to add into any new or existing pipeline.

Note: Use Microsoft Power Platform Build Tools to automate common build and deployment tasks related to apps built on Microsoft Power Platform.

Microsoft Power Platform Build Tools tasks can be used along with any other available Azure DevOps tasks to compose your build and release pipelines. Pipelines that teams commonly put in place include Initiate, Export from Dev, Build, and Release.

Microsoft Power Platform Build Tools are a collection of Power Platform–specific Azure DevOps build tasks that eliminate the need to manually download custom tooling and scripts to manage the application lifecycle of apps built on Microsoft Power Platform. The tasks can be used individually to perform a task, such as importing a solution into a downstream environment, or used together in a pipeline to orchestrate a scenario such as "generate a build artifact", "deploy to test", or "harvest maker changes."

Step 3: Create a Release pipeline.
Create a DevOps pipeline to export your completed unmanaged solution to a managed solution.

Step 4: Add a task for Microsoft Power Platform Import Solution
Solution tasks
This set of tasks can automate solution actions. The environment tasks outlined later in this section that create, copy, or restore an environment will overwrite the service connections with the newly created environments. This makes it possible to perform solution tasks against environments that are created on demand.

Power Platform Import Solution
Imports a solution into a target environment.

Incorrect:
* Create an Export pipeline.
* Run the pipeline.


Reference:

https://learn.microsoft.com/en-us/power-platform/alm/new-project-alm
https://learn.microsoft.com/en-us/power-platform/alm/devops-build-tools



HOTSPOT (Drag and Drop is not supported)
You are evaluating a solution design.
You need to test the following scenarios:

•Mimic a user using an app.
•Obtain formal approval that an app meets customer-provided criteria.
•Confirmation that an app can manage expected peak loads.

Which test types should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

  1. See Explanation section for answer.

Answer(s): A

Explanation:



Page 20 of 49



Post your Comments and Discuss Microsoft PL-600 exam with other Community members:

Seema commented on March 27, 2024
Good post on pl 600
Anonymous
upvote

imman commented on March 05, 2024
exam preparation
Anonymous
upvote

Tech Lady commented on October 17, 2023
thanks! that’s amazing
Anonymous
upvote

Tech Lady commented on October 17, 2023
Thanks! That’s amazing
Anonymous
upvote

Huh commented on September 19, 2023
Why does this site not have discussion panel?
UNITED STATES
upvote

Androw commented on May 31, 2022
This exam dump is just fabulous!
UNITED STATES
upvote

Ted commented on June 26, 2021
I just purcahsed and bought the files. The Xengine Application is a tidy tool. I will share my feedback after I write my exam.
GERMANY
upvote

Jacob commented on June 02, 2021
The website is not the best but it works and it is secure. I love sites running on HTTPS. Content of the PDF eaxm dumps are quire the same as real exam. :-)
UNITED STATES
upvote