Free NS0-593 Exam Braindumps (page: 4)

Page 3 of 16

You have a 4-node NetApp ONTAP 9.8 cluster with an AFF A400 HA pair and a FAS8300 HA pair with 16 TB NL-SAS drives. You are asked to automatically tier 150 TB of Snapshot copy data from the AFF A400 aggregates to the FAS8300.
In this scenario, which ONTAP license must be added to the cluster to accomplish this task?

  1. S3 license
  2. VE license
  3. TPM license
  4. FabricPool license

Answer(s): C



Your customer Informs you about SnapMlrror problems after upgrading NetApp ONTAP software to a newer version. After investigating the event logs and the SnapMirror history, you see information about delayed updates of the SnapMirror relationships. How would your customer prevent such problems in the future?

  1. Quiesce the SnapMirror relationships before upgrading the ONTAP software.
  2. Verify that the cabling of the hardware port that Is responsible for SnapMirror transfers Is correct.
  3. Modify the schedules of the SnapMirror relationships after upgrading the ONTAP software.
  4. Delete the SnapMirror relationships and create them new after upgrading the ONTAP software.

Answer(s): B



A customer enabled NFSv4.0 on an SVM and changed the client mount from NFSv3 to NFSv4. Afterwards, the customer found that the directory owner was changed from root to nobody.
In this scenario, which statement is true?

  1. The customer did not configure name services on the SVM.
  2. The clients must be restarted to start using NFSv4.
  3. The export policy is not configured properly.
  4. The ID mapping domains do not match between the client and server.

Answer(s): C



You have a NetApp ONTAP cluster consisting of four NetApp FAS8200 controllers with two NetApp

CN1610 cluster switches running ONIAP 9.8 software. You are receiving several alert messages stating that the cluster network has degraded. After troubleshooting, you determine that the errors are being generated from Node 2, interface e0b.
In this scenario, what should you do first to solve this problem?

  1. Replace the Twinax cable between Node 2, Interface e0b. and the NetApp CN1610 switch.
  2. Replace the motherboard on Node 2.
  3. Replace both NetApp CN1610 switches.
  4. Replace the NetApp CN1610 switch that connects to Node 2, interface e0b.

Answer(s): B






Post your Comments and Discuss Network Appliance NS0-593 exam with other Community members:

NS0-593 Exam Discussions & Posts