An administrator intends to configure a NearSync replication schedule with a 15-minute Recovery Point Objective (RPO) on a hybrid 3-node cluster. The current nodes in the cluster are configured with one SSD and four HDDs each.
Which cost-effective modification is required to support this specific replication schedule?

  1. Replace the HDDs with NVMe drives to support the IOPS requirement.
  2. Configure the cluster with a minimum of four nodes.
  3. Increase the Controller VM (CVM) memory to 64 GB.
  4. Add a second SSD to each node to meet the minimum requirement.

Answer(s): A



An organization uses a Recovery Plan to protect a SQL Cluster that relies on Volume Groups (VGs). The VGs are configured with hypervisor attachments. The administrator executes a Planned Failover to migrate the SQL Cluster to the Recovery Site.
The Failover task completes successfully, but the database administrators report that the database is offline.
What is the possible cause of this issue?

  1. An administrator failed to configure Protection Domains replication.
  2. VGs configured with hypervisor attachments do not reattach automatically after recovery.
  3. VGs cannot be protected by Recovery Plans.
  4. An administrator failed to configure mapping for the Storage Network in the Recovery Plan.

Answer(s): B



An organization requires strict control over data destruction. An administrator configures an Approval Policy for DR snapshots to prevent accidental deletion. A user attempts to delete a recovery point protected by this policy.
What is the immediate outcome of this deletion attempt within the Prism Central interface?

  1. The operation is blocked, and an email notification is sent to the super-admin for review.
  2. The operation triggers an approval request, which changes the action status to "Pending Approval".
  3. The snapshot is marked for deletion but remains recoverable for 24 hours in the recycle bin.
  4. The operation fails immediately with an "Access Denied" error message.

Answer(s): B



An administrator is planning a scheduled maintenance window that will temporarily interrupt network connectivity between the primary and recovery sites. Several Tier 1 VMs are protected with a Synchronous replication Protection Policy.
What must the administrator do before beginning the maintenance window to prevent these VMs from becoming unresponsive without making RPO changes?

  1. Execute an Unplanned Failover to move the VMs to the recovery site before the maintenance window begins.
  2. Manually pause Synchronous replication in Prism Central before the maintenance window begins.
  3. Change the Protection Policy from Synchronous to Asynchronous replication prior to the maintenance window.
  4. Update the Synchronous replication policy to enable manual failover handling.

Answer(s): C



An administrator recently expanded a Nutanix cluster by adding several new nodes. Shortly after, multiple backup jobs began failing.
The following error is consistently reported:
Failed to perform backup: Cannot complete process 'iscsiadm --mode discovery --type sendtargets --portal X.X.X.X' within timeout
What is the most likely cause of the failure?

  1. Firewall ports 3502 and 3620 are missing to the new nodes.
  2. Firewall ports 3202 and 3206 are missing to the new nodes.
  3. Firewall ports 3302 and 3360 are missing to the new nodes.
  4. Firewall ports 3205 and 3260 are missing to the new nodes.

Answer(s): D