Free NCP-BC Exam Braindumps
Nutanix Certified Professional - Business Continuity v7.5 Questions 36–40 (page: 9)

Updated On: 28-Aug-2026

An administrator is managing a mission-critical Inventory-VM that is part of a Protection Domain (PD) named PD_Production.
Monday: A scheduled snapshot of PD_Production is successfully taken.
Tuesday: Due to a configuration error during a cleanup task, the administrator accidentally removes Inventory-VM from the PD_Production Protection Domain. The VM continues to run, but it is no longer being snapped or replicated.
Wednesday: A database corruption occurs on Inventory-VM. The administrator finds the local snapshot from Monday and performs an In-place Restore (Revert) to recover the data.
Following the successful completion of the In-place Restore, what is the status of Inventory-VM regarding its data protection?

  1. The VM is restored, but it is placed into a new, system-generated PD named Restored_Entities.
  2. The VM is restored to Monday's data state and is automatically added back into the PD.
  3. The VM is restored to Monday's data state but remains outside of any PD.
  4. The restore fails because the VM is no longer a member of the PD that owns the snapshot.

Answer(s): C



An administrator executes an Unplanned Failover of web server VMs from an on-premises AZ to a Nutanix Cloud Cluster (NC2) on AWS. The Recovery Plan completes, and the VMs are running. However, external users cannot access the websites hosted on these VMs. The administrator verifies that the firewall rules are set correctly.
What specific configuration is required for these VMs to be reachable from the external network after failover to NC2?

  1. The administrator must enable Promiscuous Mode on the NC2 virtual switch.
  2. Floating IP addresses must be configured for the guest VMs.
  3. A VPN connection must be established between the NC2 cluster and the external users.
  4. The VMs must be migrated to a stretched L2 subnet.

Answer(s): B



An administrator performed an unplanned failover from AZ1 (primary) to AZ2 (recovery). Later, AZ1 is restored and the administrator wants to fail back the entities to AZ1.
Which two statements are correct? (Choose two.)

  1. Failback uses the same recovery plan, but the failover operations for failback must be performed at the primary AZ.
  2. Unplanned failover to AZ1 can use recovery points that were created locally in the past at AZ1, even if no recovery points replicate back from AZ2.
  3. After unplanned failover, replication begins in the reverse direction, and failback success depends on recovery points being replicated back from AZ2 to AZ1 after failover.
  4. After unplanned failover, failback success depends on recovery points being created locally on AZ1 before outage.

Answer(s): B,C



An administrator is configuring Disaster Recovery between an on-prem availability zone (AZ) and an NC2 cluster hosted in a public cloud. The business requires cross-cluster live migration between on-prem and NC2 without IP changes.
Which configuration must be satisfied to meet this requirement?

  1. Linear retention configured on the protection policy
  2. Layer 2 stretching between on-premises and the cloud
  3. Matching subnet names between on-premises and the cloud
  4. Synchronous replication configured

Answer(s): B



After performing a failover of encrypted AHV VMs from an on-premises AZ to a recovery AZ, an administrator notices that newly written data is not encrypted.
Which post-failover cleanup task must be performed to correct this issue?

  1. Enable replication traffic encryption.
  2. Reassign storage policies and categories.
  3. Reconfigure the replication schedule.
  4. Recreate the recovery plan and categories.

Answer(s): B



Viewing page 9 of 23
Viewing questions 41 - 45 out of 109 questions


Post your Comments and Discuss Nutanix NCP-BC exam prep with other Community members:

AI Tutor AI Tutor 👋 I’m here to help!