The temperature of a liquid is being measured by a line operator. Which is least likely to be influenced by the instrument?

  1. Recording the measurement
  2. Actual temperature of the liquid
  3. Calibration of the instrument
  4. Reading of the instrument

Answer(s): A



One of the primary benefits of your team working together to create an X-Y Diagram is that the data collected from this exercise is accurate and certain.

  1. True
  2. False

Answer(s): B



Measurement System Analysis is a procedure used to quantify variation of the method or system used for taking measurements and used to assure usable data is collected.

  1. True
  2. False

Answer(s): A



A Belt gathered the following defect data for a trouser production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:

Data: Cutting 29
Forming 43
Stitching 17

Sealing 51

  1. Sealing, Forming, Cutting, Stitching
  2. Cutting, Stitching, Sealing, Forming
  3. Stitching, Forming, Cutting, Sealing
  4. Forming, Cutting, Sealing, Stitching

Answer(s): A