Six Sigma refers to a process whose output has at least 75% of its data points within 6 Standard Deviations from the Mean.
Answer(s): B
A ___________is defined as a repetitive and systematic series of steps or activities where inputs are modified or assembled to achieve a customer desired result.
Answer(s): A
Training cost is $2,000 and a project required an initial investment of $16,000. If the project yields monthly savings of $1,500 beginning after 2 months, what is the payback period in months (before money costs and taxes)?
A single data point falling outside a Control Limit is most likely representative of .
A Belt gathered the following defect data for a coat production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:Data: Cutting 37Forming 51Stitching 82Sealing 27
Post your Comments and Discuss PEOPLECERT IASSC Lean Six Sigma - Yellow Belt exam prep with other Community members:
Our website is free, but we have to fight against AI bots and content theft. We're sorry for the inconvenience caused by these security measures. You can access the rest of the IASSC Lean Six Sigma - Yellow Belt content, but please register or login to continue.