Random causes are assigned to normal variation

  1. True
  2. False

Answer(s): B



An operator verifies that all production jobs are run. This is

  1. Quality control
  2. Quality assurance
  3. Production planning
  4. Disaster recovery

Answer(s): A



The testing intended to show that previously correct software has not been adversely affected by changes is called:

  1. Black-box testing
  2. White box testing
  3. Regression testing

Answer(s): C



The best phase that testing should begin is

  1. After project starts
  2. After requirements phase
  3. After design phase
  4. After coding

Answer(s): B