Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?
Note: There are 2 correct answers to this question.

  1. Run MRP with automatic selection of production version.
  2. Run PP/DS heuristics for repetitive manufacturing.
  3. Run MRP with quota arrangement.
  4. Assign planned orders manual lying the planning table.

Answer(s): B,C



An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. What determines whether the storage location can be derived from the production version?

  1. Plant Data
  2. MRP Profile
  3. MRP Group
  4. MRP Controller

Answer(s): C



The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.

  1. Plant Settings -> MRP Group --> Material Master
  2. Material Master -> Plant Settings -> MRP Group
  3. Material Master -> MRP Group -> Plant Settings
  4. MRP Group --> Material Master -> Plant Settings

Answer(s): C



Which transaction code can you use in SAP S/4HANA to enter and display goods movements?

  1. MBO2
  2. MMBE
  3. MIGO
  4. MBNL

Answer(s): C



Viewing page 3 of 38
Viewing questions 9 - 12 out of 148 questions