You want to integrate an existing planned order into Advanced Production Planning.
Which report do you use? Please choose the correct answer.

  1. /SAPAPO/UPD_LOC_SP_PL
  2. /SAPAPO/CURTO_CREATE
  3. /SAPAPO/PPDS_DELTA_ORD_TRANS
  4. /SAPAPO/CREATE_LOCATION

Answer(s): C



Where does the system check master data selection settings during the creation of planned orders and production orders?
Note: There are 3 correct answers to this question.

  1. In the production version
  2. In the production order type
  3. In the routing
  4. In the bill of materials (BOM)
  5. In the MRP controller

Answer(s): B,C,E



You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  1. Top of Red Base
  2. Top of Red
  3. Top of Green
  4. Top of Yellow

Answer(s): C



What are drawbacks of the separation of OLTP and OLAP?
NOTE: There are 4 correct answers to this question.

  1. Only the OLAP system has a predefined subset of the data
  2. Multiple copies of the data exist
  3. Batch process are required to keep OLTP and OLAP in sync
  4. The OLAP system needs to write back the data to the OLTP system
  5. Only the OLAP system has the latest data

Answer(s): A,B,C,D



You are using heuristic SAP_ERP_001.
Which of the following criteria are included in the automatic source determination logic when a planned order is created?

  1. Costs
  2. Quota arrangement
  3. Delivery date
  4. Vendor rating
  5. Component availability

Answer(s): B



Viewing page 4 of 31
Viewing questions 16 - 20 out of 148 questions