How would you define pegging in the context of Advanced Planning?

  1. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
  2. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
  3. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  4. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.

Answer(s): B



Which information is required when you created a production master in SAP S/4HANA?

  1. Selective screen for views
  2. Product type
  3. Base unit of measure
  4. Industry sector

Answer(s): A,B



What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?

  1. The planed order's component availability is checked.
  2. The planed order is converted to production order.
  3. The planned order's components are copied to the picking list.
  4. The planed order generates capacity requirements

Answer(s): D



Which of the following elements does MRP take into account during net requirement calculation?

  1. Purchase orders
  2. Lot size
  3. Maximum stock level
  4. Safety stock

Answer(s): B,D