Free SAP C_TS422_2021 Exam Questions (page: 3)

If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  1. Fill up based on the lot size procedure
  2. Fill up to the maximum stock level
  3. Fill up to the safety stoc level
  4. Fill up to the reorder stock level

Answer(s): A



What are the consequences if the Dispatched operation status is set for a production order operation?

  1. You can reschedule the operation using midpoint scheduling in a planning table.
  2. You can reschedule the operation using finite scheduling in planning table
  3. You can reschedule the operation using lead time scheduling in a planning table
  4. You can reschedule the order using infinite scheduling in a planing table

Answer(s): B,C



When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  1. The cross-plant status
  2. The plant-specific status
  3. The last restrictive status
  4. The most restrictive status

Answer(s): D



What is a work center hierarchy in planning in SAP S/4HANA?

  1. A group of alternative work centers providing a cumulative available capacity for production.
  2. A group of alternative work centers for production, structured in hierarchy levels by priorities
  3. A group of work centers in a production line being used in sequence for production
  4. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel

Answer(s): A



Viewing page 3 of 21
Viewing questions 9 - 12 out of 82 questions