Free C_TSCM42_67 Exam Braindumps
SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Questions 36–40 (page: 9)

Updated On: 9-Feb-2026

What functions can you use for sub operations? (Choose two)

  1. Costing
  2. Material component allocation
  3. Production/Resource tools allocation
  4. Capacity planning

Answer(s): A,D



What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

  1. Approved master recipes
  2. Digital signature
  3. Electronic batch record
  4. Availability check
  5. Resource selection

Answer(s): A,B,C



You want to produce a finished product only when it is requested by a customer order in make-to-order production.

However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)

  1. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
  2. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  3. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  4. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

Answer(s): A,C



Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?

  1. Lead time scheduling cannot take place.
  2. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
  3. Requirements planning creates an appropriate exception message in basic dates scheduling.
  4. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.

Answer(s): B



What are characteristics of repetitive manufacturing? (Choose three)

  1. Production without using production orders and without status management
  2. Shop fabrication
  3. Automatic line loading based on capacity limits across all production lines
  4. Continuous material consumption, production flow and output
  5. Period-based planning of the quantities to be produced

Answer(s): A,D,E



Viewing page 9 of 23
Viewing questions 41 - 45 out of 106 questions