The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.

Whole-Building Life-Cycle Assessment is a

  1. gate-to-gate assessment
  2. cradle-to-gate assessment
  3. cradle-to-grave assessment
  4. cradle-to-cradle assessment

Answer(s): C

Explanation:

The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.
Whole-Building Life-Cycle Assessment is a cradle-to-grave assessment. This means that the life cycle assessment (LCA) covers all stages of the building's life cycle, from the extraction of raw materials (cradle) to the disposal or reuse of the building components at the end of their service life (grave)1. The LCA must include the following life cycle stages: product stage, construction process stage, use stage, and end-of-life stage. The LCA must also account for the environmental impacts of the building's structure and enclosure, as well as any other building elements that are permanently attached to and share service systems with the building.


Reference:

Whole building life cycle assessment through LEED v4
Building life-cycle impact reduction | U.S. Green Building Council



The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space.
What benefit would this strategy provide to the owner?

  1. Increases the rainwater infiltration capacity
  2. Decreases the amount of bicycle parking that must be provided
  3. Increases the overall SR (solar reflectance) of the hardscape area
  4. Decreases the required amount of on-street parking that must be provided

Answer(s): A

Explanation:

Reducing the area planned for surface parking and replacing it with additional vegetated space can provide several benefits to the owner, such as:
Decreasing the amount of bicycle parking that must be provided, since there will be less demand for parking spaces for cyclists.
Increasing the overall SR (solar reflectance) of the hardscape area, which can reduce the cooling load and energy consumption of the building.

Decreasing the required amount of on-street parking that must be provided, since there will be less demand for parking spaces for cars.
However, one of the most significant benefits of this strategy is increasing the rainwater infiltration capacity, which can improve the water quality and quantity in the stormwater system. According to a study by Biondolilo1, integrating green space into parking lots can decrease stormwater runoff, mitigate the heat island effect, store carbon, improve air quality and may have social benefits as well. The study estimated that converting 30% of Manhattan's parking into green space would decrease runoff and pollutants from parking lots. Therefore, this strategy can help reduce water demand and environmental impact in arid climates.


Reference:

How Eliminating Parking Minimums Actually Makes Cities Better Analyzing the benefits of reducing parking: improving public transportation to reduce parking demand and increase space for green infrastructure in Manhattan, Kansas Benefits of Urban Vegetation and Green Spaces - BeautyHarmonyLife Reduce Urban Heat Island Effect | Green Infrastructure | US EPA



The maximum number of points for Water Efficiency Credit, Cooling Tower Water Use can be obtained by

  1. utilizing a once-through system without recirculation
  2. limiting cooling tower make-up to 50% of a potable source
  3. conducting a one-time potable water analysis to determine acceptable non-potable sources
  4. achieving a minimum of 10 cooling tower cycles by increasing the level of make-up water treatment

Answer(s): D

Explanation:

Achieving a minimum of 10 cooling tower cycles by increasing the level of make-up water treatment is the way to obtain the maximum number of points for Water Efficiency Credit, Cooling Tower Water Use. This credit aims to conserve water used for cooling tower equipment by encouraging the use of non-potable water sources and increasing the cycles of concentration. The cycles of concentration are the ratio of the concentration of dissolved solids in the blowdown water to the concentration of dissolved solids in the make-up water. Increasing the cycles of concentration reduces the amount of make-up water and blowdown water, and thus saves water and energy. The credit has two options:
Option 1. Non-potable Water Source (1 point) and Option 2. Cooling Tower Water Use (2 points). Option 1 requires using at least 50% non-potable water for cooling tower make-up water. Option 2 requires achieving a minimum number of cooling tower cycles based on the quality of the make-up water, as specified in Table 1 of the credit requirements. The maximum number of cycles is 10, which can be achieved by increasing the level of make-up water treatment to meet the criteria for conductivity, silica, and alkalinity. Therefore, Option 2 is the way to obtain the maximum number of points for this credit.


Reference:

Credit: Cooling tower water use | U.S. Green Building Council Cooling Tower Evaporation Credits | WaterSignal



What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

  1. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided
  2. Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-

    three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided
  3. Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided
  4. Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Answer(s): A

Explanation:

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided. This is the requirement for Retail projects under the Materials and Resources Prerequisite, Storage and Collection of Recyclables, according to the LEED v4 BD+C Reference Guide. The purpose of this prerequisite is to facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills. The prerequisite applies to all LEED BD+C projects, but Retail projects have a different approach than other project types because of their unique waste streams and operational characteristics. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. The audit or projection must identify the top-five recyclable waste streams by weight or volume using consistent metrics throughout. The waste stream study period must be a minimum of 24 hours. Retail projects must also provide dedicated areas that serve the entire building and are accessible to waste haulers and building occupants for the collection and storage of materials for recycling for at least four of the top-five recyclable waste streams identified by the audit or projection.


Reference:

Prerequisite: Storage and collection of recyclables | U.S. Green Building Council



Page 10 of 78



Post your Comments and Discuss US Green Building Council LEED-AP-BD-C exam with other Community members:

Ntombi commented on October 17, 2024
i find the questions helpful for my exam preparation
Anonymous
upvote

Ntombi commented on October 17, 2024
The questions help me to see if I understood what I have learned
Anonymous
upvote

ntombi commented on October 17, 2024
writing exam at the end of the month
Anonymous
upvote

Apvj commented on October 17, 2024
Need to update section 5 questions,it was all new question today in exam , unitl section 4 it was fine even though pattern of question changed
Anonymous
upvote

ghada commented on October 17, 2024
it helps a lot
Anonymous
upvote

John commented on October 17, 2024
Good mock exam
Anonymous
upvote

test commented on October 17, 2024
Good content
UNITED STATES
upvote

Manoo commented on October 17, 2024
Hello guys, I hope everyone is doing good and preparing for this exam. I just wanted to share my experience about my exam. I wrote this exam yesterday and I passed. The key is to focus on each topic and memorize all these questions. You see most of them in your test. Good luck
INDIA
upvote

Ad commented on October 17, 2024
Hi I am new to IT
Anonymous
upvote

sadai commented on October 17, 2024
I really apricate this helpful test thank you so much
Anonymous
upvote

Lee commented on October 17, 2024
This is a very good resource. I'm glad this is provided for free for everyone to pass their exam. I'm sure everyone knows how difficult these exams are.
UNITED STATES
upvote

BANKEY BIHARI LAL commented on October 17, 2024
Very good mock exams as per the actual exam standards.
INDIA
upvote

Faruk commented on October 17, 2024
is free content is enough for pas az-900 ?
Anonymous
upvote

chad johnson commented on October 16, 2024
learning from this test
UNITED STATES
upvote

Keketso commented on October 16, 2024
This is a valuable resource for Az-900, i think
Anonymous
upvote

MP commented on October 16, 2024
Still Preparing Hopefully these are helpful
UNITED STATES
upvote

dado commented on October 16, 2024
cool thanks
BELGIUM
upvote

Harry commented on October 16, 2024
Thanks for the sample exam!
UNITED STATES
upvote

Rajesh K commented on October 16, 2024
fantastic contents provided by free braindumps, it is improving my accuracy.
Anonymous
upvote

chris commented on October 16, 2024
this dumps is very helpfull
Anonymous
upvote

Kiran commented on October 16, 2024
These are related questions
UNITED STATES
upvote

raj singh commented on October 16, 2024
This is a good resource for az-900, go for it.
INDIA
upvote

Gobenathan commented on October 16, 2024
This is a good exam done but the free version is not complete the PDF version has all the question. that is what I used to pass my exam.
INDIA
upvote

Girish commented on October 16, 2024
Question are nice
Anonymous
upvote

SS commented on October 16, 2024
Nice Interface
UNITED STATES
upvote

Mohit commented on October 16, 2024
Passed this exam on second try with the help of this exam dumps. Very close to real exam.
India
upvote

XyRome commented on October 15, 2024
Where is the next set?
FRANCE
upvote

ano commented on October 15, 2024
Nice one help me lot
Anonymous
upvote

Draksh commented on October 15, 2024
Good content
UNITED STATES
upvote

Kumar commented on October 15, 2024
I can confirm this is legit and valid in UK. Passed the exam today. Good work.
UNITED STATES
upvote

Ank commented on October 15, 2024
good questions
Anonymous
upvote

Ankita commented on October 15, 2024
Nice questions
Anonymous
upvote

Ankita commented on October 15, 2024
Interesting questions
Anonymous
upvote

Laks commented on October 15, 2024
If you need to pass in first try you must use this exam dump. I passed on the first go.
Anonymous
upvote